Browse Forums Paving & Concreting Re: Suspended concrete slab on top floor of office building. 2Feb 10, 2019 8:43 am Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Suspended concrete slab on top floor of office building. 4Feb 10, 2019 11:28 am princeplanet MAXIMUM expected LIVE LOAD (drum kit, piano, 4 amplifiers, instruments, cases and 7 people ) = only 28.5 kg /m2 It's factored Dead Loads plus Live loads refer to the codes,0.285KPa? Try 10 times your calculated amount If you want more accurate coupled results then use 3D BIM simulations Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs What is going to go in that corner when the floor is filled in? Take that info to a qualified engineer and ask them re the proper procedure/material. 2 11438 My home office is hot with computer equipment running virtually 18 hours a day. When it gets unbearably warm I simply step out of my door into the living area which is… 0 13503 I have a toilet that blocks up on the top (2nd) floor of a property. The toilets on the 1st and ground floor are OK) Blockage clears when the using a plunger. But… 0 8568 |