Browse Forums Bathrooms and Laundry 1 Aug 21, 2010 7:52 pm Villina with Contemporary Facade + Alfresco *Demo 22/4/2010 *Pool 04/05/2010 *Released to Construction 24/05/2010 *Slab 29 June 2010 *Start of Frame 30 July 2010 - 21 Aug 2010 *Bricks started 14/09/2010 - 13/10/2010 *Roof started (Facsia) 15/10/2010 *Lock Up 10/12/2010 *PCI 18 Feb *Keys in hand 24 Feb *IOC 09 March 2011 My Thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=39843 Re: Has anyone else got the SMART WASTE system Installed? 2Oct 19, 2010 6:02 pm Villina with Contemporary Facade + Alfresco *Demo 22/4/2010 *Pool 04/05/2010 *Released to Construction 24/05/2010 *Slab 29 June 2010 *Start of Frame 30 July 2010 - 21 Aug 2010 *Bricks started 14/09/2010 - 13/10/2010 *Roof started (Facsia) 15/10/2010 *Lock Up 10/12/2010 *PCI 18 Feb *Keys in hand 24 Feb *IOC 09 March 2011 My Thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=39843 Re: Has anyone else got the SMART WASTE system Installed? 6Oct 19, 2010 7:47 pm Never argue with an idiot they drag you down to their level & then beat you with experience - Dilbert View Thread: viewtopic.php?f=31&t=19733 Contract signed 14Sept Slab 30Sept Bricks laid 1Dec Lock up 26Feb Keys 10Jun Re: Has anyone else got the SMART WASTE system Installed? 8Oct 19, 2010 8:54 pm Built The Jenmark with Cavalier Homes Macarthur. http://camdenacres.blogspot.com/ Thread - viewtopic.php?f=31&t=17870 We are in - front landscaping begins Re: Has anyone else got the SMART WASTE system Installed? 9Oct 20, 2010 2:25 pm Villina with Contemporary Facade + Alfresco *Demo 22/4/2010 *Pool 04/05/2010 *Released to Construction 24/05/2010 *Slab 29 June 2010 *Start of Frame 30 July 2010 - 21 Aug 2010 *Bricks started 14/09/2010 - 13/10/2010 *Roof started (Facsia) 15/10/2010 *Lock Up 10/12/2010 *PCI 18 Feb *Keys in hand 24 Feb *IOC 09 March 2011 My Thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=39843 Re: Has anyone else got the SMART WASTE system Installed? 10Oct 20, 2010 3:12 pm Built The Jenmark with Cavalier Homes Macarthur. http://camdenacres.blogspot.com/ Thread - viewtopic.php?f=31&t=17870 We are in - front landscaping begins Re: Has anyone else got the SMART WASTE system Installed? 12Oct 21, 2010 7:06 pm Villina with Contemporary Facade + Alfresco *Demo 22/4/2010 *Pool 04/05/2010 *Released to Construction 24/05/2010 *Slab 29 June 2010 *Start of Frame 30 July 2010 - 21 Aug 2010 *Bricks started 14/09/2010 - 13/10/2010 *Roof started (Facsia) 15/10/2010 *Lock Up 10/12/2010 *PCI 18 Feb *Keys in hand 24 Feb *IOC 09 March 2011 My Thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=39843 Re: Has anyone else got the SMART WASTE system Installed? 14Oct 22, 2010 12:34 pm Many thanks for that info. I would not have looked out for it on inspection, but will most certainly make a note of it now. Much appreciated:-) Villina with Contemporary Facade + Alfresco *Demo 22/4/2010 *Pool 04/05/2010 *Released to Construction 24/05/2010 *Slab 29 June 2010 *Start of Frame 30 July 2010 - 21 Aug 2010 *Bricks started 14/09/2010 - 13/10/2010 *Roof started (Facsia) 15/10/2010 *Lock Up 10/12/2010 *PCI 18 Feb *Keys in hand 24 Feb *IOC 09 March 2011 My Thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=39843 Re: Has anyone else got the SMART WASTE system Installed? 15Oct 22, 2010 3:13 pm We using them regularly in our bathroom desings. They work real well with dark floors, as on light floors you tend to see a shadow line between the two boxes. We use the Queuaus range. the centre plate is held in position by 4 spigots allowing pleanty of clearance and reducing blockages on the under side of the plate. Cheers Re: Has anyone else got the SMART WASTE system Installed? 16Oct 24, 2010 7:33 am Thanks Charlie, appreciate the professional advise. Im even happier to hear that as we have dark floor tiles, yeeha! Villina with Contemporary Facade + Alfresco *Demo 22/4/2010 *Pool 04/05/2010 *Released to Construction 24/05/2010 *Slab 29 June 2010 *Start of Frame 30 July 2010 - 21 Aug 2010 *Bricks started 14/09/2010 - 13/10/2010 *Roof started (Facsia) 15/10/2010 *Lock Up 10/12/2010 *PCI 18 Feb *Keys in hand 24 Feb *IOC 09 March 2011 My Thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=39843 Re: Has anyone else got the SMART WASTE system Installed? 18Jul 02, 2011 3:12 pm Has anyone's smart tile been installed like this (in relation to the tile joins) and if so do you have any drainage problems? [img] http://www.buildinganewhome.com.au/wp-c ... ver-wr.jpg[/img] We already paid for somfy motors for the blinds. The quote above was purely for “pre-wiring” so the blinds company can install the motors and blinds. That’s why we… 5 18488 If so what were the "special circumstances" under which it was granted? "Note: If the development consent is for 'dual occupancy' an owner-builder permit can only be… 0 14830 Shelly switches require a paid subscription for full access to all features which is ridiulous given the lifespan of a home and if you were to sell it or buy a home with… 2 5233 |