Browse Forums Building A New House Re: Nathan & Lisa's Renovation - Pouring of Footings R.2 6Mar 23, 2010 5:15 pm Never argue with an idiot they drag you down to their level & then beat you with experience - Dilbert View Thread: viewtopic.php?f=31&t=19733 Contract signed 14Sept Slab 30Sept Bricks laid 1Dec Lock up 26Feb Keys 10Jun Re: Re: Nathan & Lisa's Reno - More blocks & framing at last 19Jun 16, 2010 4:07 pm Ok, it's been a while. Bedroom/Ensuite framing done. Waiting on roof. Kitchen living framing 90%. Waiting on roof. Roofs to go in next week. Terrace is blocked up. 800 blocks in one day. Slabs under terrace (terrace is the store room below) to be done soon. (hurry up digital door locks I need the parts!) Neighbours wall taken down. Colonnades blocked, filled and beam boarded up and poured. Another few tons of concrete there. Here are some pics. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Looking down from house to the pool. Through the colonnades. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Looking down at laundry/bathroom. You walk through the laundry to get to a shower and toilet, mainly used for pool use. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Looking down at laundry. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ View from ensuite. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Don't be shy boys! Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Under the laundry, this is where the ducted AC and instant how water will be, gated front. Wall yet to be built on the far side. Both pics below show another storage area under the stadium seating. I'll make up some gates for them. Later on they will have nice fancy wood doors, that is when we decide to build in underneath the exiting house. Note: All plumbing and electrical will accommodate future work. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Exit to backyard from store. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Store entrance. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Getting ready for slab pour. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Drainage ditch where neighbours wall used to be. Collapsed in the rain. Front of house, terrace on left. Under the terrace is store room, for mowers and what not. Where my steel post is there is a corner of a landing. That will be boarded up and a slab laid on top, then more blocks on top to make a wall/seat. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Looking at the stars from the house to the laundry down below and the master bedroom up top. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Minimum overhang into gutter must be 50mm, turn down tool should not split the sheet. it seems wrong tool for the profile was used, the flashing cannot slope back. Rib… 2 2464 Electrical just got back to me and said the most they can provide is a single power point on the Bedroom 1 side of that wall. After handover, your towel rail installer… 2 4899 |