Browse Forums Building A New House Re: Copy of application made to developer 2Aug 30, 2018 9:43 am Our Bayside KDR Thread: viewtopic.php?f=31&t=78298 Re: Copy of application made to developer 4Aug 30, 2018 6:21 pm We're a knock down rebuild, but we got all drafting plans, etc required via our CSC. We've got a flood overlay, so had a lot of jigging and rejigging of plans to do during the process, and no issues at all. In a greenfield development, the developer tells you of the plans from Metricon are suitable or not, they don't draw them up Our Bayside KDR Thread: viewtopic.php?f=31&t=78298 Hello All, I have a small lot in one of the suburbs in Brisbane. It is 402 sqm. According to small lot code, I can construct only 50% of the area. Is there a way my… 0 1491 Thanks mate. Would you be happy to pass on their details? I'll message you. 2 1198 Brass or 2) Stainless steel made - which Kitchen tap is good for drinking.Brass kitchen taps in Australia contain lead… 0 8182 |