Browse Forums Building A New House Re: Masterton Homes - The next thread 4.0 12878Dec 10, 2016 2:29 pm Synergy 32 Contemporary Facade https://synergy32.wordpress.com/ 05/15 Deposit 09/15 Contracts 11/15 Demolition 02/16 Slab 03/16 Frame 05/16 Bricks Re: Masterton Homes - The next thread 4.0 12879Dec 10, 2016 3:29 pm Thanks, and to you also We are heading down tonight with our Xmas tree to set it up as well. The kids have been busting to do it. So it's take out fish and chips in the new house and putting up the tree. When is moving day for you ? We are flat out packing between 3 Xmas celebrations this weekend. Masterton Villina Elite 2016 23/3 Slab 13/4 Frame & Windows 24/5 Bricks 19/8 Roof 29/9 Gyprock 3/11 Paint Re: Masterton Homes - The next thread 4.0 12880Dec 10, 2016 3:32 pm Drive way, it looks dark but it fades to similar colour to the tiles. We are also doing a wrap around on the left side with a pad down the side for the kids to play handball and for when I win lotto I'll get a camper van that can't get done until the back yard is excavated. Back to packing Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Masterton Villina Elite 2016 23/3 Slab 13/4 Frame & Windows 24/5 Bricks 19/8 Roof 29/9 Gyprock 3/11 Paint 4 17197 i imagine you also have another contract with an architect? and yeah, whatever other's said about special conditions and appendices 16 16613 Hi all I am looking to run a water line under my concrete footpath which is directly next to my home, was seeing if this is possible without cutting the entire section… 0 20696 |