Browse Forums Building Standards; Getting It Right! Re: Did they do our slab retaining properly? 3Aug 13, 2016 11:10 am Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Did they do our slab retaining properly? 5Aug 14, 2016 8:03 pm Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Did they do our slab retaining properly? 9Aug 15, 2016 7:31 pm Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Did they do our slab retaining properly? 12Aug 17, 2016 7:50 pm Hi Icebreaka Why should you be worried about getting the builder offside This is how he and others should see it 1. He charged you $18K for what, a bit more concrete? 2. He didn't follow the engineers details? 3. And luckily you took photos and are now querying the amount and details 4. You are entitled to an engineers guarantee even more so now. I suggest you contact the Building department at the local Council ,as the engineering details are incorrect and get further advice either from the building commission, consumer protection or a lawyer. Should you have problems with the retaining and House in years to come you'll Thank your lucky stars..most people building homes put terrible photos up that equate to zip should anything go structurally wrong at a later date Keep us posted Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Did they do our slab retaining properly? 13Sep 01, 2016 10:14 am Hey Icebreaker How's it going..its been 2 weeks..any resolution? Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Did they do our slab retaining properly? 14Sep 08, 2016 4:18 pm Hi, Got an update... Spoke to the building services manager today. He's had a look at photos, and spoken to those involved. He talked me through the process they went through.. He acknowledged that what was planned was footing with bars, then concrete blocks, then concrete poured into the blocks.. then single skin brickwork on the outside to join up with the external wall brickwork... Instead they went with the concrete poured drop edge.... He said normally, they wouldn't do a drop edge for anything over 1M... Reason being that its too hard to get the formwork to hold all the concrete... In my case, the concreter believed he could get the formwork to hold... And so they decided to go that route, and in doing so saved about a week to 2 weeks in build time... He calculated the difference in cost between the two options... saying the only difference is the blocks, estimated to be about 170 blocks and the cost to lay the blocks... They still needed the footings, the bars, scaffolding for brickwork later on, and the single skin brick.. He said the overall difference he came up with is $456 ... I told him I was disappointed with the figure, he said he's open to discussion on where I think a greater difference in cost could be.... I then asked for an engineers guarantee in writing.. He said that the engineer who did the engineers detail went on site and inspected and approved the slab/form before it would have been done.. He told me that its all in the engineers drawings I received... I then said that the drawing has a drop edge only 0 - 600mm and again asked for an engineers guarantee in writing.. He told me thats no problem, he'll get an amended drawing from the engineer and have it to me next week... Don't know what to think overall... I guess $450 is better than nothing? And I'm getting the engineers guarantee so I guess thats that? Re: Did they do our slab retaining properly? 15Sep 08, 2016 5:36 pm Hi Icebreaka Less than 500 buck$ that's laughable considering what they slugged you in the first instance The Engineer needs to inspect & certify what was done on the slab/retaining wall and I doubt anyone viewed the reinforcement because if they did they would have queried what was done & left out just as I did.. Wait for the drawings & Certificate.. thanks for the update Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs My door tends to rub against the frame during winter and I'm looking to fix it so it closes smoothly. Looking online on Youtube I'm seeing methods to fix the alignment and… 0 1474 These are photos of small sections as I don’t want to identify myself yet. All frames in the house have cement/mortar all over them, have had for months & months.… 2 1615 Ask the council if there is a chance of getting build over easement exemption. Sometimes easements are unused and 24cm is not all that much. Good luck. And yes any builder… 2 15026 |