Browse Forums Building A New House Re: Masterton Homes - The next thread 4.0 8521Nov 16, 2015 1:55 pm Cl'd/Peg: 20/03/2015 Cut & Slab: 24/4/2015 & 3/05/2015 Frames: 28/05/2015 Roof: 21/06/2015 Bricks: 11/07/2015 Lock Up: 7/08/2015 PCI: 18/11/2015 Re: Masterton Homes - The next thread 4.0 8523Nov 16, 2015 2:36 pm MGardz - That was the quote for both roller and planation. One window alone for plantation was $3700. Its the balcony sliding door. We are in Newcastle, not sure if Nepean blinds come up here, ill have to investigate. I have another company coming tonight to do a quote. Masterton Villina Elite 2016 23/3 Slab 13/4 Frame & Windows 24/5 Bricks 19/8 Roof 29/9 Gyprock 3/11 Paint Re: Masterton Homes - The next thread 4.0 8524Nov 16, 2015 4:03 pm marina12 Thanks Gillym the M inspector that comes after PCI does he tell you the things he found Mgardz- thanks I hope your new SS is efficient. He doesn't tell you, as such, but you can certainly tell that he's been! I happened to bump into him accidentally....... the day after PCI I drove past (can't remember why now!) but saw the M car out the front, so stopped and went in. He told me who he was and what he was doing, so I left him to it. When I had gone to PCI, I took a roll of tape and had coloured it pink (so it would be noticable) to mark everything we wanted fixed. (The painter already knew about the obvious bits). Then this M inspector came along with a roll of purple tape....... here's just one pic of a wall he noted paint issues. I had found just one area that needed attention (see my pink tape)....... then look at what he felt needed attention! http://i832.photobucket.com/albums/zz241/GillyM63/IMG_1249_zps72dd53f0.jpg So you will know when he's been! How did your PCI go today? Masterton Overture 17/12/14 - Handover ...... we got the keys !! blog - http://www.mcnamaraadventure.blogspot.com Re: Masterton Homes - The next thread 4.0 8525Nov 16, 2015 4:08 pm Unfortunately not good SS impossible to deal with. KDR. Overture Premier 09/14 $3900 10/14 Plans 11/14 Contracts 03/15 Demo 04/15 Validation 05/15 Slab 06/15 Frame 06/15 Bricks 09/15 lock up 16/12/15 Keys Re: Masterton Homes - The next thread 4.0 8526Nov 16, 2015 4:18 pm you'll be finished with him very, very soon. so long as all things have been noted to get fixed. Were there many things to be done? Did the gap above your stacker doors get fixed? Masterton Overture 17/12/14 - Handover ...... we got the keys !! blog - http://www.mcnamaraadventure.blogspot.com Re: Masterton Homes - The next thread 4.0 8527Nov 16, 2015 4:24 pm It didn't go ahead with SS he didn't want to continue he became aggressive. And closed the doors and wanted us to leave. I told him that we have a inspector coming we are not going anywhere. When inspector came he left. Unbelievable KDR. Overture Premier 09/14 $3900 10/14 Plans 11/14 Contracts 03/15 Demo 04/15 Validation 05/15 Slab 06/15 Frame 06/15 Bricks 09/15 lock up 16/12/15 Keys Re: Masterton Homes - The next thread 4.0 8528Nov 16, 2015 4:39 pm wow...... he is nasty!!! i hope you're taking this further up the m ladder! Masterton Overture 17/12/14 - Handover ...... we got the keys !! blog - http://www.mcnamaraadventure.blogspot.com Re: Masterton Homes - The next thread 4.0 8529Nov 16, 2015 4:40 pm Ye wrote to CC Gillym- your WIR was yours just one row of hanging space all around. Ours has just the one KDR. Overture Premier 09/14 $3900 10/14 Plans 11/14 Contracts 03/15 Demo 04/15 Validation 05/15 Slab 06/15 Frame 06/15 Bricks 09/15 lock up 16/12/15 Keys Re: Masterton Homes - The next thread 4.0 8530Nov 16, 2015 4:42 pm Oh dear Marina - an SS spitting the dummy. Now I have heard it all .... I would definitely go beyond your CC if you don't get immediate results. That is crazy. 2013 1st tender 24/10 Dep. 18/11 2014 5% 25/02 CDC approval 5/5 Demo 26/5 Pool 3/7 Valid'n 10/7 Slab 11/8 Frame 19/9 Bricks 23/10 2015 Roof 3/12 Lock up 11/2 PCI 31/3 Final insp. & keys 30/4 Re: Masterton Homes - The next thread 4.0 8532Nov 16, 2015 4:46 pm Yes we were left with our independent inspector KDR. Overture Premier 09/14 $3900 10/14 Plans 11/14 Contracts 03/15 Demo 04/15 Validation 05/15 Slab 06/15 Frame 06/15 Bricks 09/15 lock up 16/12/15 Keys Re: Masterton Homes - The next thread 4.0 8534Nov 16, 2015 4:54 pm The top of stacker was finished off we have dented stacker and sliding doors and window frame chipped bench top different colour bricks leaking under kitchen sink and bathroom sink. Did everyone have there doors painted on top and underneath .? KDR. Overture Premier 09/14 $3900 10/14 Plans 11/14 Contracts 03/15 Demo 04/15 Validation 05/15 Slab 06/15 Frame 06/15 Bricks 09/15 lock up 16/12/15 Keys Re: Masterton Homes - The next thread 4.0 8535Nov 16, 2015 4:56 pm marina12 The top of stacker was finished off we have dented stacker and sliding doors and window frame chipped bench top different colour bricks leaking under kitchen sink and bathroom sink. Did everyone have there doors painted on top and underneath .? We didn't but we picked it up at our inspection. Apparently it is most important in your wet areas. Re: Masterton Homes - The next thread 4.0 8536Nov 16, 2015 4:59 pm Yes the inspector told us the same ours haven't been done either KDR. Overture Premier 09/14 $3900 10/14 Plans 11/14 Contracts 03/15 Demo 04/15 Validation 05/15 Slab 06/15 Frame 06/15 Bricks 09/15 lock up 16/12/15 Keys Masterton Homes - The next thread 4.0 8537Nov 16, 2015 5:14 pm OMG how bad is that Marina!! Even our old SS was nicer than that and by the sounds of our letter his leaving or moving was not his choice lol or it's just a poorly worded letter. SVE it's plantations on all windows including a seamless unit on my balcony door/window but it's a mix of woodlore and Woodbury - Woodbury I think is the top of the range that provides better closure and insulation - we have that in the rooms and main living areas. Anyway long story short hopefully nepean can supply you! https://mandgbuildatmulgoarise.wordpress.com/ Re: Masterton Homes - The next thread 4.0 8538Nov 16, 2015 5:55 pm marina12 Ye wrote to CC Gillym- your WIR was yours just one row of hanging space all around. Ours has just the one no, our wir has two most of the way around, plus two sections which are full length hanging. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Masterton Overture 17/12/14 - Handover ...... we got the keys !! blog - http://www.mcnamaraadventure.blogspot.com 4 17197 i imagine you also have another contract with an architect? and yeah, whatever other's said about special conditions and appendices 16 16613 Hi all I am looking to run a water line under my concrete footpath which is directly next to my home, was seeing if this is possible without cutting the entire section… 0 20696 |