Browse Forums Building Standards; Getting It Right! Re: Piers\Footing poured at same time as slab? 2Aug 26, 2015 10:39 pm Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Piers\Footing poured at same time as slab? 9Aug 29, 2015 11:50 am Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Piers\Footing poured at same time as slab? 13Sep 01, 2015 8:41 am Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Piers\Footing poured at same time as slab? 15Sep 02, 2015 5:33 pm 3in1 Supadiverta. Rainwater Harvesting Best Practice using syphonic drainage. Cleaner Neater Smarter Cheaper Supa Gutter Pumper. A low cost syphonic eaves gutter overflow solution. Re: Piers\Footing poured at same time as slab? 19Sep 03, 2015 6:12 pm The piers are in contact with the soil and moisture could travel up the pier onto the slab.Defeats the purpose of a moisture barrier but I'm guessing because I haven't seen it done before. Re: Piers\Footing poured at same time as slab? 20Sep 03, 2015 6:46 pm insider The piers are in contact with the soil and moisture could travel up the pier onto the slab.Defeats the purpose of a moisture barrier but I'm guessing because I haven't seen it done before. I agree I am with Structural BIMGuy, check your engineering design and specification and ensure it is followed. Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Hello needing some advice. I was about to build my Alfresco and needed a new slab and remove exisiting slab as its not standard. So they start to excavate and jackhammer… 0 12178 PM me your email. I have a build excavation calculator you can use based on your plans to double check what your builder is telling you. Cheers Simeon 1 10826 I've dug some footings to embed a post anchor into. My holes are around 450mm deep which I'll put a 200mm stirrup into. The bottom of these holes seem firm enough. … 0 3772 |