Browse Forums Building A New House Re: Burbank Custom DS- Site Fence and port-a-loo REMOVED!! 282Jul 30, 2014 2:28 pm Colours - 12/12/13 Contracts - 4/2/14 Slab - 12/3/14 Frame - 26/3/14 Lockup - 21/5/14 My Thread viewtopic.php?f=31&t=70419 Re: Burbank Custom DS- Site Fence and port-a-loo REMOVED!! 283Jul 30, 2014 6:25 pm Burbank Custom DS 23/01 Slab 14/02 Frame 15/04 Lockup 13/06 Fixing 02/09 PCI 11/09 Settlement My Build:viewtopic.php?f=31&t=68855 Blog:http://ourmentone3850.blogspot.com.au Re: Burbank Custom DS- Site Fence and port-a-loo REMOVED!! 284Jul 31, 2014 6:20 pm Burbank Custom DS 23/01 Slab 14/02 Frame 15/04 Lockup 13/06 Fixing 02/09 PCI 11/09 Settlement My Build:viewtopic.php?f=31&t=68855 Blog:http://ourmentone3850.blogspot.com.au Re: Burbank Custom DS- Gas Meter INSTALLED!! 285Jul 31, 2014 9:07 pm Colours - 12/12/13 Contracts - 4/2/14 Slab - 12/3/14 Frame - 26/3/14 Lockup - 21/5/14 My Thread viewtopic.php?f=31&t=70419 Re: Burbank Custom DS- Gas Meter INSTALLED!! 286Aug 04, 2014 12:23 am I love you white kitchen, look super Re the windows, my back neighbor's house is a 2 storey, all their first floor windows are partly translucent so that they can't look into my house, I remeber they installed windows with clear glasses then put on window films to make them partly translucent. As far as I can remember, u would have to wait about another 2 weeks for PCI from the day it booked, but that's still very soon, just a bliiiiinnnnnkkkkkk, ha! Re: Burbank Custom DS- Gas Meter INSTALLED!! 287Aug 04, 2014 10:12 pm Gee it's expensive to move a water meter Who in their right mind would put it there? Surely they would have had copies of the house plans before choosing where to site the water meter!? Gorgeous pendant lights We also used Lighting Illusions - I think we got our ceiling fans from there. The end is very near, I think you'll beat me to handover Custom downslope build Build thread viewtopic.php?f=31&t=61873 Blog http://www.buildingroyalmanor.blogspot.com.au Re: Burbank Custom DS- Gas Meter INSTALLED!! 288Aug 16, 2014 5:39 pm Week 31- Crack Mirror Robe Replaced Mon 04 Aug - Sun 10 Aug 2014 (Day 158-162) Besides the company Premiumoz returning to replace the crack MasterBedroom Mirror Robe, no other work was done at the house. Still no phone call from the SS to advise house is ready for PCI appointment. I dont feel any love at the moment... It seem just like a waiting games these last few weeks. Hopefully by this time next week I have something to report on Week 32- Still Awaiting PCI!! Mon 11 Aug - Sun 17 Aug 2014 (Day 163-167) It is now beyond a joke as its been three (3) whole weeks since the sight fence and hired equipment were removed and yet I am still waiting for the SS to call and book the PCI inspection Despite my Contract Admin advising me last week that the SS was due to call this week to book me in for the PCI inspection ( House was still going through some internal QA's checks) BUT it did not happen... I am now getting very frustrated as the house has been left in the same state it was three weeks ago and there are STILL a few items that I raised early on yet have not been actioned. I must say I was fortunate we did not run into major hiccups during the build but the last few weeks just waiting for the final inspection is really making me think twice with building again with volume builders or am I just one of those unlucky ones??? Anyone been in my state before or know what is the hold up??? Burbank Custom DS 23/01 Slab 14/02 Frame 15/04 Lockup 13/06 Fixing 02/09 PCI 11/09 Settlement My Build:viewtopic.php?f=31&t=68855 Blog:http://ourmentone3850.blogspot.com.au Re: Burbank Custom DS- Still Awaiting PCI!!!! 289Aug 19, 2014 1:39 pm Hi Mentone! Sorry I have been slack! Why? That is my only question I would be asking them! If they have a good reason as to why your PCI as not been book, then ok. But why not book it? If they cannot do it for a month, then book it in a months time! Then that way at least you would know that you most likely would be moving in 6 weeks! It's just c*%p that they are making you wait! I think you and me both have been unlucky (mine is continuing!). Maybe Burbank are just better at building smaller house! I am hoping you get a date some time this week! Figures crossed! Good luck! Colours - 12/12/13 Contracts - 4/2/14 Slab - 12/3/14 Frame - 26/3/14 Lockup - 21/5/14 My Thread viewtopic.php?f=31&t=70419 Re: Burbank Custom DS- Still Awaiting PCI!!!! 290Aug 19, 2014 2:52 pm It's horrible that you're still waiting Can you ring the builder and ask for PCI date? Custom downslope build Build thread viewtopic.php?f=31&t=61873 Blog http://www.buildingroyalmanor.blogspot.com.au Re: Burbank Custom DS- Still Awaiting PCI!!!! 291Aug 19, 2014 3:19 pm Mentone3850 Week 31- Crack Mirror Robe Replaced Mon 04 Aug - Sun 10 Aug 2014 (Day 158-162) Besides the company Premiumoz returning to replace the crack MasterBedroom Mirror Robe, no other work was done at the house. waiting for the SS to call and book the PCI inspection lol that reminds me - our place was unlocked the day before PCI and we got in and noticed that one of the kids bedroom mirrors on the robe sliding door was broken. When we went in for the PCI the next day the SS was already there when we arrived and surprise surprise the broken mirror door was rolled behind the other door to hide it. So I rolled it out and said in mock surprise "Oh look, it's broken". He was visibly annoyed. I'm guessing he'd hoped to blame it on us after handover. He'd also parked his ute in the driveway extremely coincidentally right on top of the spot where a concreter had spilled some cement water and made a big grubby splash mark on the new coloured driveway. Moral of the story is to be thorough when you do PCI. Completed a knock down and rebuild in northern Melbourne. Handover completed 27/09/2013 and now moved in. Re: Burbank Custom DS- Still Awaiting PCI!!!! 292Aug 19, 2014 8:43 pm dsbuild Hi Mentone! Sorry I have been slack! Why? That is my only question I would be asking them! If they have a good reason as to why your PCI as not been book, then ok. But why not book it? If they cannot do it for a month, then book it in a months time! Then that way at least you would know that you most likely would be moving in 6 weeks! It's just c*%p that they are making you wait! I think you and me both have been unlucky (mine is continuing!). Maybe Burbank are just better at building smaller house! I am hoping you get a date some time this week! Figures crossed! Good luck! After 3 weeks of no movement at the house I had to but contact admin for an update and asked.. Admin also couldn't tell me much so arrange for ss to call me to discuss my concerns .... So SS called today (finally) but again no date..now he telling me it may be another few weeks ( I was not pleased to hear this ) and said coz hes really busy with other build in same stages as mine ... i grunted and said that what you told me last time we spoke ( which was 3 weeks ago) then later he said he call back this friday and see .. errrr lets see It's really fustrating not being able to get a time frame as this means I cannot book any tradies , let alone put my house on the rental market til I know what's happening.. I am very disappointed with how things are turning out and level of service..We are so close to the finish line but yet so far.. Anyone know how long from pci inspection does Burbank arrange for occupancy permit ? Or does it come first ? Re: Burbank Custom DS- Still Awaiting PCI!!!! 293Aug 20, 2014 7:22 am Mentone3850 Anyone know how long from pci inspection does Burbank arrange for occupancy permit ? Or does it come first ? It could be any time. For us, we were quite literally sitting in the office for official handover after doing the final inspection at the house and it came through while we were there. It was almost at the point that they were going to have to reschedule handover. Completed a knock down and rebuild in northern Melbourne. Handover completed 27/09/2013 and now moved in. Re: Burbank Custom DS- Still Awaiting PCI!!!! 294Aug 20, 2014 9:38 am Bluesuede Mentone3850 Anyone know how long from pci inspection does Burbank arrange for occupancy permit ? Or does it come first ? It could be any time. For us, we were quite literally sitting in the office for official handover after doing the final inspection at the house and it came through while we were there. It was almost at the point that they were going to have to reschedule handover. Thanks BLuesuede But doesnt the bank need to see this before the release the last payment?? Re: Burbank Custom DS- Still Awaiting PCI!!!! 295Aug 20, 2014 9:48 am Mentone3850 Bluesuede Mentone3850 Anyone know how long from pci inspection does Burbank arrange for occupancy permit ? Or does it come first ? It could be any time. For us, we were quite literally sitting in the office for official handover after doing the final inspection at the house and it came through while we were there. It was almost at the point that they were going to have to reschedule handover. Thanks BLuesuede But doesnt the bank need to see this before the release the last payment?? Mine was self funded so the bank wasn't involved. Completed a knock down and rebuild in northern Melbourne. Handover completed 27/09/2013 and now moved in. Re: Burbank Custom DS- Still Awaiting PCI!!!! 296Aug 23, 2014 3:32 pm Week 33 - Outstanding Issue fixed/PCI Booked!! Mon 18 Aug - Sun 24 Aug 2014 (Day 168-172) After (3) weeks of no activities we finally have some update to post As at start of the week the below were the outstanding issues that needed to be addressed by the builder:- - Main Bathroom En suite Window (translucent film to be removed) - Covering for External wall vents - Gap between brickwork and Kitchen/ Pantry windows frames - Water Meter relocation - Change External sensor lights (Single globes as opposed to double have been ordered/installed) - Excess Dry Concrete removed from Rear of Garage After 3 weeks of no movements/activities at the house I had to but contact admin to see whats going on. Admin couldn't tell me much as no updates was provided to her also so she arranged SS to call me directly to address my concerns / outstanding issues. SS eventually called me Tuesday (finally!!!) but again 'no date'.. He only called to run through the last few items/issue I raised (some dates back to start of the build) and then advised he will address my issues and contact me in few weeks to book PCI. I was not at all pleased when I heard that.. I then went on asking him why there hasn't been any progress on the house the last few weeks but all he could advise was he's been working on other builds around that is at the same stages as mine ... I grunted and stated 'thats what you told me last time we spoke 3 weeks ago' . So in the end we comprised that he'll call back Friday and we can work when we can book in PCI. ( I am happy with that, even if its in a few weeks at least I have a date to work towards) On Thursday, the issues I raised were addressed, it such a better feeling than how I've been feeling the last few weeks I tell you. Below was the issues fixed Main Bathroom En suite Window (translucent film removed) Anyone know how they remove this film without replacing/ damaging windows???? Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Covering for External wall vents Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Gap between brickwork and above Kitchen/ Pantry windows frames Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Excess Dry Concrete removed from Rear of Garage Before Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ After Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Rear Garage Door Lock Fitted Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ This shows they can knock off all the issues in one day if they really wanted too !!! Fri 22 Aug - PCI booked - Day 172 Thought this would be another week of disappointment but finally just after lunch the SS called to advise the what needed to be done prior to PCI. He asked for me to arrange for my independent inspector to come do the inspection next Wednesday 27th August (alone) and then for me to bring the report along on PCI day. So yes finally PCI inspection has been booked for Tuesday 02 September @ 7:30am (Week 35) I know I know you may be asking why so early on the day but at least I now have a date to work with I was told by admin they have 14 days to fix any defect after PCI so hoping I get the the keys by Fri 19th September ( (Week 37) Lets see how !! Hopefully I have another update for you in a couple of weeks Hows everyone else build going? You guys must either all be packing, booking the removalist or unpacking and in your new homes Burbank Custom DS 23/01 Slab 14/02 Frame 15/04 Lockup 13/06 Fixing 02/09 PCI 11/09 Settlement My Build:viewtopic.php?f=31&t=68855 Blog:http://ourmentone3850.blogspot.com.au Re: Burbank Custom DS- Outstanding Issue fixed/PCI Booked!! 299Aug 24, 2014 8:21 am Great news! We had PCI Friday and no major issues, mainly painting! Settlement 5th September. Hope all goes well for your PCI but as you've seen the house so often there can't be anything major that you wouldn't have seen already! Re: Burbank Custom DS- Outstanding Issue fixed/PCI Booked!! 300Aug 24, 2014 1:38 pm Great news Mentone3850 finally!!! Wishing you folks a very best wishes and hope settlement goes smooth as well. 27.08.13 Building Contract 09.07.14 Site Start 24.07.14 Base / Slab 28.07.14 Frame 27.08.14 Lockup 15.09.14 Fixout 25.11.14 Settlement Our external decking was only installed 2 months ago, and already moulded, with cracks, and some timber decolorated. The decking is in an exposed area, uncovered in our… 0 1401 Hi All, Recently we have signed a contract with Burbank and we are not aware that they have just DORSET, SURREY, HAMPSHIRE, KENT, PILBARA and REDGUM bricks from PGH are… 0 3802 If there have been changes, variations, during construction then the drawings should be revised, the building permit amended and the current, as built drawings given to… 2 4821 |