Browse Forums Building A New House Re: anybody building with hickinbotham? 2Feb 26, 2013 1:28 pm Our build thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=60755 Re: anybody building with hickinbotham? 6Feb 26, 2013 8:32 pm My son and his fiance's build viewtopic.php?f=31&t=66084 24/7 Slabbed 30/7 Framed 05/8 Gutters 08/8 Roof & windows 31/8 gyprock,bricks,cornice 3/9 Lock up 8/11 In Re: anybody building with hickinbotham? 9Feb 27, 2013 12:00 pm My son and his fiance's build viewtopic.php?f=31&t=66084 24/7 Slabbed 30/7 Framed 05/8 Gutters 08/8 Roof & windows 31/8 gyprock,bricks,cornice 3/9 Lock up 8/11 In Re: anybody building with hickinbotham? 12Feb 27, 2013 2:56 pm My son and his fiance's build viewtopic.php?f=31&t=66084 24/7 Slabbed 30/7 Framed 05/8 Gutters 08/8 Roof & windows 31/8 gyprock,bricks,cornice 3/9 Lock up 8/11 In Re: anybody building with hickinbotham? 14Feb 27, 2013 6:15 pm sent you both a couple of emails hopefully something in there can help you out a little bit Siteworks 8/11 Slabbed 19/11 Our Thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=65703 Re: anybody building with hickinbotham? 15Feb 27, 2013 8:30 pm thankyou so much davelle for the email, very much appreciated most of the prices seem reasonable, i was thinking worse. i asked hubby to phone our sales consultant to see if he will email us some prices?? awaiting a phone call back as it went to message bank. jo i like the 900mm gas stove top and the 900mm oven or the freestanding dual fuel 900mm stove/oven. i have been looking around at prices online to see if we can get an electrician to do it ourselves but being as we are country i am not sure that we will save money as travel is included into the prices we have on our house. Re: anybody building with hickinbotham? 16Mar 04, 2013 2:25 pm Davelle If you both PM me your email adresses I can send you some info that I've got Sending you a PM Davelle--wonder if you might send me the info too. Re: anybody building with hickinbotham? 17Mar 15, 2013 5:28 pm Hi Hachy, How far along are you with the process? My son is at Master Plan stage and they have already rejected the first set of plans as they were not correct. A big mistake that they missed moving a window from one wall to another so another set need to be made up. Also they wanted a cavity sliding door put in and was quoted for one and the consultant instead made it a face sliding door $350.00 and now have been told they can't have a cavity one as they didn't "quote" for a cavity only a face sliding one and when they pushed for it they have been told the wall is not wide enough for a cavity. They are really disappointed. They are also having some problems with complying 6 star energy rating even though they have upgraded all the insulation, put insulation in the Internal walls as well. The Company want to resize a window in the living room by 30cm and at a "reduced" cost of $250 instead of $500 . Can't help feeling they are getting r*pped off but what can you do? Cheers Jo My son and his fiance's build viewtopic.php?f=31&t=66084 24/7 Slabbed 30/7 Framed 05/8 Gutters 08/8 Roof & windows 31/8 gyprock,bricks,cornice 3/9 Lock up 8/11 In Re: anybody building with hickinbotham? 18Mar 15, 2013 11:31 pm hi jo, that isnt good to hear your son is being stuffed around we have our colour selections appt on tuesday, we didnt have a problem with the master plans as we didnt change anything although looking at a couple of the doors and the way they swing i wish i had of changed those, i am assuming that changing the way a door swings would cost money cos they would have to redraw plans so i guess i will have to deal with the doors swinging the wrong way but i am sure they wont be hard to change later on. the council has approved the first part, just waiting on the second two parts but i think they need to look at colours as they dont like red and orange roof tops etc(not that we were having those colours anyway). i dont know if our house meets the 6 star efficiency rating or not? would the council not have passed the first stage if it wasnt compliant? i am sure come tuesday at our appt we will feel like we are getting ripped off, surely there will be costs that we are unaware of. h Re: anybody building with hickinbotham? 19Mar 16, 2013 8:38 am The low energy rating was picked up after they got the Master Plans which they didn't sign as the window wasn't moved to where they wanted it. I am not sure what would have happened if all was well and they had signed them. Scott got a phone call from the Construction Services guy who told him he had to change the size of the window to meet requirements. So now there is another variation form to fill in for the extra charge for the resizing of the window. You may be surprised at selections re the costing as Scott has been a couple of times to the showroom and has had some pricings from them on what they want upgraded. So far they are only up for about $4000 extra and the footings came back $3000 less than they allowed so that was a bonus for them. Are you getting the NBN at selections?? If so, that is $1030.00 but apparently that is a good price as to get it put on after is alot more than that. There are some things that can still be changed at selections, so ask about your doors as Scott is having a sliding door removed at selections and it is not costing anything to do it (they have this in writing as well to make sure). His consultant says that is the last chance to change things without incurring variation costs. Council approvals in the Playford area are getting approved really quick. The consultant said one of his got approved in 1 week, so fingers crossed his is quick too. Good luck at selections My son and his fiance's build viewtopic.php?f=31&t=66084 24/7 Slabbed 30/7 Framed 05/8 Gutters 08/8 Roof & windows 31/8 gyprock,bricks,cornice 3/9 Lock up 8/11 In Re: anybody building with hickinbotham? 20Mar 16, 2013 10:53 am We have a list of upgrades, so far it is $3700 from the prices we got from our consultant. Our footings are fixed were scotts variable? Always nice to get prices come back cheaper, so far we have an extra $1000 added on cos we were underquoted on stormwater and something else. NBN? National broaddban network? Hmmm maybe not at that price. Hey guys building a new place through a volume builder and just wondering if i should complain to the site supervisor as we just had plasterboard installed. Looks like… 0 11861 Elvis has left the building... The site supervisor quit after 2 month on the project. I guess he was just instructed to bark at people, but didn't like when he was… 26 21670 |