Browse Forums Building A New House REDink Prestart Costings - Please help 3Feb 27, 2012 3:19 pm Building our own custom design with Redink Pre-start - 28/06/2011 Building license approval - sept 2011 Footings - 8/10/2011 my thread - viewtopic.php?f=31&t=48921 Re: REDink Prestart Costings - Please help 6Feb 27, 2012 6:18 pm Thank yo Leezels I was stressing it was going to cost around $3-4000... Anyone else have any other pointers..... I am wondering what it will cost to get full render on the front of the house?? any ideas Re: REDink Prestart Costings - Please help 7Feb 27, 2012 6:34 pm Hey Mary I was quoted a little while back 1450 on the front render if that helps prices may have changed by now though Oct 10 - Council Approval Oct 23 - Site scrape Oct 29 - Footings and Prelay OCT 30 - Slabbed Nov 6 - Bricks Delivered Nov 13 - Brickwork started Re: REDink Prestart Costings - Please help 9Feb 27, 2012 6:55 pm HI All, just wondering how much redink will charge for waterfall edges to our kitchen island and extend to add a breakfast bar.. we have the free essastone bench tops... Also we are only allowed to pick from the formica range for our cabinetry.... just wondering if it is very expensive to upgrade to like super gloss or polyrey REDink Prestart Costings - Please help 10Feb 27, 2012 7:01 pm Mary, I don't know about the waterfall edges but whatever house your costing is based on that size bench is what is included, and anymore can be quite expensive, be mindful that each slab of stone is 3000mm long As for high gloss, our kitchen was about $700 extra and bathroom about 200 ensuite 300 ish to upgrade!! Building our own custom design with Redink Pre-start - 28/06/2011 Building license approval - sept 2011 Footings - 8/10/2011 my thread - viewtopic.php?f=31&t=48921 REDink Prestart Costings - Please help 11Feb 27, 2012 7:05 pm Oh and I grabbed this quote from my thread to give u an idea of what the extra costs were for our electrical.. as a bit of a guide our elec changes cost us 1700 however this includes all light switches with dimmers, all double gpo's, about 10 extra gpo's, 4 TV points with data next to them, and a few extra lights outside. oh and a 40 amp single phase power outlet for our spa outside a couple of the big ticket items were our splashback which was an extra 600 or so, (600x300 tiles) changing the alfresco from 25c hardiflex to 28c recessed plasterboard with the eaves 25c (just over 2k) Building our own custom design with Redink Pre-start - 28/06/2011 Building license approval - sept 2011 Footings - 8/10/2011 my thread - viewtopic.php?f=31&t=48921 Re: REDink Prestart Costings - Please help 12Feb 27, 2012 10:52 pm Hi All, Wow I link the prices of your upgrades. I am going from whatever the standard height is to 32c upper floor and 35c ground floor and I am being charged around 22K. Render for the sides and rear (front is included) is 18K. Upgrading from laminate master ensuite, guest ensuite and kids ensuites plus stone in powder room is 6.8K> I am querying everything but it is sure mounting up..... Glad I have seen this thread. Ciao Mark Re: REDink Prestart Costings - Please help 14Feb 28, 2012 12:28 am CC101.... for the 5k what is that getting you. I have not even considered electrical so i would be keen learn what additional stuff costs. I will put more GPOs and will what some dedicated 20amp lines for amps etc.... Thanks in advance Cheers Mark Re: REDink Prestart Costings - Please help 15Feb 28, 2012 12:33 am marybond2012 HI All, just wondering how much redink will charge for waterfall edges to our kitchen island and extend to add a breakfast bar.. we have the free essastone bench tops... Also we are only allowed to pick from the formica range for our cabinetry.... just wondering if it is very expensive to upgrade to like super gloss or polyrey Our waterfall end was about the $1100 mark. Building with Dale Alcock in Piara Waters Re: REDink Prestart Costings - Please help 17Mar 04, 2012 9:59 pm AussieMark CC101.... for the 5k what is that getting you. I have not even considered electrical so i would be keen learn what additional stuff costs. I will put more GPOs and will what some dedicated 20amp lines for amps etc.... Thanks in advance Cheers Mark no down lights. 2 gas points, 2 tv points, flumed exhaust, few conduits, extra lights and powerpoints in and outside. it still took us to 5k approx. Re: REDink Prestart Costings - Please help 18Mar 04, 2012 11:18 pm Hi Jlil, PM sent, did not want to derail the thread..... Hi Everyone, wondering if anyone has done a prestart lately with summit homes in WA and what kind of costs were associated with adding gpo's and downlights? we are also… 0 4048 i had the my concreters concrete right up to the fence. I have pits all along my path, so the water tends to drain away from the house and into the pits. There's only one… 7 13386 All 3 items listed are defects and are of concern. Please seek qualified independent inspector and/or legal advice for your state. 1 8479 |