Zinner
tstr1a
Did you find a solution ?
Not yet, the builder wants to charge me 7500 for the delay, and 5600 for waffle slab with 30 piers. my contract states that i will be getting waffle slab, so now they say its the piers. I also received a letter if i do not sigh this, they will cancell my contract and take my deposit etc... I am so upset, so upset!!!!!!
You need legal advice.. Who is your builder?
Start by calling ACCC or fair trading Vic
Quote:
Not yet, the builder wants to charge me 7500 for the delay, and 5600 for waffle slab with 30 piers. my contract states that i will be getting waffle slab, so now they say its the piers. I also received a letter if i do not sigh this, they will cancell my contract and take my deposit etc... I am so upset, so upset!!!!!!
You need legal advice.. Who is your builder?
Start by calling ACCC or fair trading Vic
I think its ARB from an earlier post.
I would definitely get legal advice on this if they are threatening to pull the contract and you lose your deposit.
This sounds a bit extreme. Surely they can adjust the time and/or and give you time to finance this extra money etc...
From what I hear for most contracts, the slab is up to the builder (dependent on soil tests etc) and any slab upgrades that they think are required to build your house safely means you pretty much have to except what they say (but check your contract). The builder is the one that will end up in trouble if the house falls down etc.. so most like to put a slightly stronger slab down than what the soil tests might say is acceptable minimum strength.
My builder included this upgrade cost in my initial quote as an upgrade to an "M" class waffle slab and it cost me about 10k. Weather or not it is required I guess it up the the builder but I guess they will do (have done?) the upgrade anyway as its safer for them in the long run.
All in all, mine was 10k for slab and 5k fixed until May but all this was told to me by my builder and paid for by me upfront so there were no surprises.... and then I had the penalties to pay...
Hello,
For me, The M class with waffle slab is already include but the problem will start if they do the soil test(after the contract) n required to upgrade...so what will happen becaz we already sign contract with them(M class waffle slab)...trouble will bring up...so stress of building new house..land delay..step by step by the builder..lots more will come...