Browse Forums Heating, Cooling & Insulation Re: Builder wants Bonaire I want Actron 5May 19, 2010 11:35 am Build thread: viewtopic.php?f=31&t=34120 Handover 23 Dec 11 Squatting 21 Dec 11 Fixed 12 Oct 11 Plastered 31 Aug 2011 Framed 7 June 2011 Site Start 7 Feb 2011 Land Titled 18 Jan 2010 Land Deposit 25 Jun 2009 Re: Builder wants Bonaire I want Actron 10Jun 15, 2010 1:01 pm I had an Actron Air Platinum system installed 3 years ago. Mirvac homes built my home and recommended them to me during my selections process. I have since had all zone motors replaced and a capacitor for the motor burn out in my roof. The people who installed it, Marsh Air ( Marsh Airconditioning ) from Toongabbie NSW ( Castle Hill ), a company operated or owned by Ian Marsh , I believe did a poor job on installation. Some ducting came apart and had to be fixed within the first few months due to incorrect installation. 3 years later it is leaking water and has damaged my ceiling. Marsh air went into receivership within 12 months of installation and refused to do any further warranty repairs, then restarted their business under a different licence number. Mirvac Homes washed their hands of any responsibilty, and the Dept of Fair Trading could do nothing except refer me to the liquidators. Do your homework and beware of the traps. Re: Builder wants Bonaire I want Actron 11Jun 21, 2010 4:10 pm Actron Air are the best in every way. But you can't help stupid installers. Perhaps if the consumer was not focused on price so much and more on quality, things would be a whole lot better. Eg. When I first started installing in 1979 homes were worth around $50,000 and ducted air conditioning cost $10-11,000 back then. Now homes are worth $400k or more and ducted air conditioning is till the same. Re: Builder wants Bonaire I want Actron 12Jun 21, 2010 10:29 pm Good to hear good stuff about Actron. Ive never heard of the company but my air con guy recommended it. does anyone know how much roughly it would cost for a 4x2 big house? for inverted/ducted air con? Building the Pegasus New Generation Bletchley Pk, Southern River Land purchased 03/2009 Contract 06/2009 Prestart 09/2009 Land cleared/sand Pad 10-12-09 Fittings done 17-12-09 SLAB!! 18-12-09 Brickies started 27-1-10 Roof Started 2-3-10 Lock Up 13-5-10 Re: Builder wants Bonaire I want Actron 14Jun 21, 2010 11:24 pm thats not bad. i wonder how much the Ultima ones are? the ones where you can set each rooms temp. happy to pay a bit more if its going to save in the long run. Building the Pegasus New Generation Bletchley Pk, Southern River Land purchased 03/2009 Contract 06/2009 Prestart 09/2009 Land cleared/sand Pad 10-12-09 Fittings done 17-12-09 SLAB!! 18-12-09 Brickies started 27-1-10 Roof Started 2-3-10 Lock Up 13-5-10 Re: Builder wants Bonaire I want Actron 16Jul 06, 2010 5:50 pm Well, my Actron system works well - when it works. Since installation in December last year it has been out of action more often than not (no gas). Had the installers here for the 4th time today to fix it again. This is the last time though, next time I am going to insist that the unit is replaced, I don't want it repaired any more. Re: Builder wants Bonaire I want Actron 17Jul 06, 2010 5:56 pm u9026a Well, my Actron system works well - when it works. Since installation in December last year it has been out of action more often than not (no gas). Had the installers here for the 4th time today to fix it again. This is the last time though, next time I am going to insist that the unit is replaced, I don't want it repaired any more. No gas so quick is almost always an installation issue... Have you taken this up with Actron themselves yet...? If not I would, since they may bite the bullet for you and fix it themselves... Re: Builder wants Bonaire I want Actron 18Jul 06, 2010 6:20 pm We have been quoted on a 17.7KW Cooling and 18KW heating Actron ESP Plus. Our house is 400sqm and the price were quoted for eight zones is $15,500. THE LIGHT OF MY LIFE IS 495 SQM OF BEACH SAND AND WEEDS! http://missvintageshouseofpain.blogspot.com/ Re: Builder wants Bonaire I want Actron 19Jul 07, 2010 12:21 am Thanks Miss Vintage, that sounds good! can i ask who you went through? Building the Pegasus New Generation Bletchley Pk, Southern River Land purchased 03/2009 Contract 06/2009 Prestart 09/2009 Land cleared/sand Pad 10-12-09 Fittings done 17-12-09 SLAB!! 18-12-09 Brickies started 27-1-10 Roof Started 2-3-10 Lock Up 13-5-10 Re: Builder wants Bonaire I want Actron 20Aug 24, 2018 9:38 am mollii Hi All, This is a very good place for gathering information and also giving it. The reverse cycle ducted thing is SO confusing. Where I am building has no natural gas so RC is what I am going for. The builder uses Bonaire but I have only heard negative things about them. I asked builder to price an Actron system and they have told me it is way more expensive than a comparable Bonaire system. Their quote is $16500 and only 2 Zones but from what I can gather from this forum I can get an Actron way cheaper and with more features. My house is Approx. 31 squares single storey. Should I leave this until after build? Any advice greatly appreciated Thanks Love to hear more about it... if you don't mind to share, as I'm on same boat... we plan to build 31 squares single storey homes... Thank you @ashington Homes for your reply! They just got back to me and offered credit for me to just take it as is. It was a less than quotes I got from ceiling… 6 3005 Sounds like rubbish to me. Ask for the contamination report which I doubt they have. If it's part of a normal subdivision it would have had a contamination report done… 9 5965 Hi Mofflepop, I would recommend finding a building designer to prepare plans, they should design to your specified budget. The benefit is you can tender the project out… 9 22206 |