Browse Forums Building A New House 1 Feb 16, 2010 3:17 pm I'm struggling over which stages to get the house inspected at. What stages have people done/recommend? One inspector told me not to worry about getting the site checked just before the concrete for the slab is poured, another did advise me to get one done as it's too late once the concrete's down. I was thinking of pre-slab, frame and pre-handover. However, one inspector advised that lockup is highly recommended to make sure the wet areas are thoroughly sealed. I'm toying with idea of getting the four done. Any suggestions? Life is; then you tell yourself a story. you need to understand the breakdown of warranties. 90 warranty is considered as minor defects rectification period where as the longer ones are more major/structural… 1 5730 Hi, I have this sewer inspection point sitting in an odd spot in the rear of my yard: https://imgur.com/ghLI98q What I'd like to do is put a firepit in that corner of… 0 7041 The worst thing you can do is sign a building contract without a pre contract review. Over the years many people have come to me with disputes where they just signed… 0 8947 |