Browse Forums Building A New House 1 Sep 24, 2009 8:12 pm Builder; Big M Design; Soho 32 Facade; Ascent Blog; http://mickeyb-soho.blogspot.com Trend; viewtopic.php?f=31&t=23990 Re: Building with Metric0n 4Sep 24, 2009 9:55 pm Blog: http://bluemistkids.blogspot.com "Never be afraid to try something new. Remember, amateurs built the ark, and professionals built the Titanic." Re: Building with Metric0n 6Sep 25, 2009 5:20 am Builder; Big M Design; Soho 32 Facade; Ascent Blog; http://mickeyb-soho.blogspot.com Trend; viewtopic.php?f=31&t=23990 Re: Building with Metric0n 7Sep 25, 2009 7:58 am Hi mickeyb, Very good question. We are also building with M up here in Queensland and I am also curious as to the use an independent building inspector. Would love to hear any advice on this matter. Regards Luke Re: Building with Metric0n 8Sep 25, 2009 8:28 am We are having inspections at 2 stages and M is fine with it just want the company details and then they will organise a time with the SS. But as it hasn't happened yet hoping it goes all fine. My CSC for building is great so should do!! Forum thread viewtopic.php?f=31&t=22300 Re: Building with Metric0n 9Sep 25, 2009 11:01 pm What company are you using to do your inspection?? Where did you find them? What stages are recommended for inspection? Builder; Big M Design; Soho 32 Facade; Ascent Blog; http://mickeyb-soho.blogspot.com Trend; viewtopic.php?f=31&t=23990 Re: Building with Metric0n 11Sep 26, 2009 9:01 am Thanks corked, but it was actually the very clever perryr. It's on the index page of 'Building A New House'. It has them all listed. viewtopic.php?f=31&t=1522 I just cut and pasted the Met. ones. www.themaxbuild.blogspot.com forum.homeone.com.au/viewtopic.php?f=31&t=20717&start=300 www.leahspaperpassion.blogspot.com Re: Building with Metric0n 12Oct 02, 2009 8:50 pm Update: All paperwork done; contracts sign, bank approval, council permits approved structural change, just waiting of finals drafts of the house plan as we had a late variation, SS to inspect our land a double check the measurements and surveyors pegs so they know where to legally build the house and waiting for building permits to come through. Builder; Big M Design; Soho 32 Facade; Ascent Blog; http://mickeyb-soho.blogspot.com Trend; viewtopic.php?f=31&t=23990 Re: Building with Metric0n 13Oct 02, 2009 10:16 pm mickeyb Update: All paperwork done; contracts sign, bank approval, council permits approved structural change, just waiting of finals drafts of the house plan as we had a late variation, SS to inspect our land a double check the measurements and surveyors pegs so they know where to legally build the house and waiting for building permits to come through. Hi Mickeyb, we are building with M and are in the process of making a variation - today we got an email saying yes we could but we are yet to get costings though. Can I ask what you changed and what did you get charged to have the variation - aside from the cost of works? Thanks and good luck Land: Titles 27/10/2009 - settled 9/11/2009 House Design: Talbot 28 (Contemporary Façade) Estimated move in date April 2010 ... ok maybe June 2010 with any luck Site Start 22/01/10 - 20/08/10 Handover!! Sandarra Facebook Group Re: Building with Metric0n 14Oct 02, 2009 10:35 pm Im not building with M, but since theres so many of you building with them, and soooo many threads on them..... perhaps make a General Info Thread for M like the one I made for Carlisle.. I see so many new M threads everyday, would be so much better to have just one thread.. Since I made the Carlisle general thread, there havent been any of those quick questions on Carlisle threads cropping up. Also think a Thread for PD should be made too. Would benefit the many PD customers there are on here. Cheers Re: Building with Metric0n 15Oct 03, 2009 5:18 am Hi kbudggie, our late variation was brick in fills above the windows on side and rear of the house and they slugged us 500 to re-draft the plans and a 500 late fee. Which was harsh as we weren’t informed about the brick in fills until the contract was signed. Where about are you going to build? Builder; Big M Design; Soho 32 Facade; Ascent Blog; http://mickeyb-soho.blogspot.com Trend; viewtopic.php?f=31&t=23990 Re: Building with Metric0n 16Oct 03, 2009 9:29 am mickeyb Hi kbudggie, our late variation was brick in fills above the windows on side and rear of the house and they slugged us 500 to re-draft the plans and a 500 late fee. Which was harsh as we weren’t informed about the brick in fills until the contract was signed. Where about are you going to build? We are building just down the road from you in Sandarra. Our final plans have not been drawn up yet and we had the in fills added in too which were a pre-construction variation. We never had a walk-through and I am sure that has caused a lot of issues for us and we may be missing out on things we were never offered or made aware of but oh well! Land: Titles 27/10/2009 - settled 9/11/2009 House Design: Talbot 28 (Contemporary Façade) Estimated move in date April 2010 ... ok maybe June 2010 with any luck Site Start 22/01/10 - 20/08/10 Handover!! Sandarra Facebook Group Re: Building with Metric0n 17Oct 03, 2009 2:32 pm Yes the lack of any explicit mention of infills seems to be a systemic problem with M. They never mentioned them to me either until I asked. Yet it's an issue that EVERY home builder will be interested in. Metricon Riva 33 - http://herlihy-riva.blogspot.com Site start 15/03/2010 - Handover 23/12/2010 9 months and 8 days (284 calendar days) from site start to handover Re: Building with Metric0n 18Oct 03, 2009 2:37 pm You’re not that far at all. We had the same thing happen to us, never had a full walk through and they never take you out side to show you around the outside of the house or we would of picked up on the brick in-fill. Lucky for us we have a friend who’s an owner builder and friend that had built in the past and they brought to our attention a lot of things to add to the house, which the builder never brought up with us. We swapped and changed a lot thing before signing the contract, just took for granted that brick in-fills were a normal practice in building. But all is good now, for now. Are you doing many things to the house after hand over? Builder; Big M Design; Soho 32 Facade; Ascent Blog; http://mickeyb-soho.blogspot.com Trend; viewtopic.php?f=31&t=23990 Hey guys building a new place through a volume builder and just wondering if i should complain to the site supervisor as we just had plasterboard installed. Looks like… 0 11880 Elvis has left the building... The site supervisor quit after 2 month on the project. I guess he was just instructed to bark at people, but didn't like when he was… 26 21702 |