Browse Forums Building A New House Re: Masterton Homes - The next thread 4.0 14573Sep 04, 2019 9:48 am Hi All, we are building our 2 storey home with Masterton and went in to their tiles and carpet store the other day just to look around to get a feel for the available selections and we weren't satisfied . We are now considering to do flooring for both floors ourselves through an external person. Can anybody please help us to undetsand how much credit we will get back from Masterton for doing flooring ourselves? Has anyone done this and how much credit did you received back? Re: Masterton Homes - The next thread 4.0 14574Sep 04, 2019 2:26 pm We took out the provision for flooring before we signed the contract as we planned on doing it after handover but ended up using their masterton supplier anyway as it would have been all covered by mastertons warranty and they only allowed that supplier to go in to complete prior to handover. I think the flooring guy said we were lucky we did it this way as it was cheaper because the builder doesn't add their margin. In general you won't get much credit back. We had to bring in the whole one side of the house about 600mm to fit in the width of the land and only got about $1500 credit back. Smeg Rangehood credit only $500 because we wanted another rangehood to be done after handover. Best ask Mastertons what credit would be allowed for your flooring if you chose not to get Mastertons to do it. Re: Masterton Homes - The next thread 4.0 14575Sep 04, 2019 2:38 pm 3lilpigs We took out the provision for flooring before we signed the contract as we planned on doing it after handover but ended up using their masterton supplier anyway as it would have been all covered by mastertons warranty and they only allowed that supplier to go in to complete prior to handover. I think the flooring guy said we were lucky we did it this way as it was cheaper because the builder doesn't add their margin. In general you won't get much credit back. We had to bring in the whole one side of the house about 600mm to fit in the width of the land and only got about $1500 credit back. Smeg Rangehood credit only $500 because we wanted another rangehood to be done after handover. Best ask Mastertons what credit would be allowed for your flooring if you chose not to get Mastertons to do it. Just $1500 for the whole one side of the house?? Wow thats way to less. I will ask them today however based on your message i dont think i can expect much. Re: Masterton Homes - The next thread 4.0 14576Feb 02, 2020 10:01 am Hi guys, new here I have been passively reading the forum. We are looking at building the grange 60sqm. Does anyone have any recent feedback with the grange and/or Masterton in general for the last year? I get the impression that Masterton is quite slow and I should budget for a 2 year timeframe from tender to actual handover? Also, does anyone have a rough idea of how much percentage more I should budget for on top of the ultimate package? Thank you Re: Masterton Homes - The next thread 4.0 14577Jun 28, 2020 8:06 pm gibson Thanks for sharing your story. Question...which other builders did you consider and what was it about Masterton that made you decide that was the one to go with? Was it the layout, style, customer service, inclusions etc? Just trying to get a feel for the builders as we start out journey in looking for a builder for a KDR. These stories have been great so thanks again Re: Masterton Homes - The next thread 4.0 14580Dec 29, 2022 12:45 pm Hi Everyone, Just wanted your opinion on the situation. I've built with Masterton, recently I had a flood downstairs, because the shower drain got a bit clogged and the water filled up about 15mm. It did not go outside of shower cabin. As the water was going through the drain some of it went under the tiles travelled to the bathtub drain area and went downstairs. Apparently there is a gap between the shower drain pipe and the drain hole, which is according to Masterton "by design", and this allows the water to travel between the floor tiles and the waterproofing. There supposed to be a little barrier around the hole in the floor where the bathtub drain pipe goes through. Apparently it is either not sealed or the water goes above it. Masterton called a waterproofer, who inspected the bathroom and said he will tell Masterton how to fix it. Masterton came back to me later saying this is not their problem, as "the water filled above the angle which allows the water to go where ever. There is not water proofing problem. Need to keep floor waste free of body hair". I asked for a copy water proofer's report, so I have something in writing. Never got it. I refuse to believe that hair in the drain should be causing floods downstairs as long as the water does not leave the tiled floor of the bathroom. What do you think? Thanks. 2014 30/05 $3900 25/08 Contracts 02/10 DA submitted 2015 17/02 DA approved 02/04 Colors 10/04 Demo 09/07 Construction start 27/07 Fill 15/08 Slab 21/09 Frame 2016 08/01 Bricks 4 17249 i imagine you also have another contract with an architect? and yeah, whatever other's said about special conditions and appendices 16 16709 Hi all I am looking to run a water line under my concrete footpath which is directly next to my home, was seeing if this is possible without cutting the entire section… 0 20765 |