Browse Forums General Discussion Re: Find number of formwork steel H frames that are required 4Sep 26, 2018 8:13 am Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Find number of formwork steel H frames that are required 6Sep 29, 2018 12:36 am Credit goes to cyclic Quote: Fairly simple math really. If a frame is 1.8 meters and has a gap to the next frame of 1.5 meters, then a frame covers 3.3 meters, so, length of deck in meters divided by 3.3 meters = number of frames +1 for the extremity.. Same for width of deck, then multiply the 2 answers. eg deck is 30 meters x 22 meters. 30 divided by 3.3=9.09+1 for the extremity=10 frames covers 33 meters. 22 divided by 3.3=6.6+1 for the extremity = 7 frames covers 23.1 meters. So 10 for length multiplied by 7 for width = 70 frames is a rough calculation. Or am I missing something ??? The concreter will take and reuse. In my case I bought structural LVLs and scraped them back and used them as joists. 1 5818 Hi I am wanting some opinions about the build of a steel shed I am going to get one about 4.5 x 2.5 m steel shed and the height will be about 2.3-2.4m high The one I am… 0 14939 If this is a custom build then I would expect the builder to set out the door frame closer to the wall to avoid the gap between architrave and the wall and or specify… 9 8874 |