Metricon don’t take long to put up the frame. I had mine 4 days later. Both top and bottom was done in 6 days. And frame was made onsite. Cos it was a cheaper way. As we had so much wood. It would have take so many truck loads. Tradies were shocked my ss said. They couldn’t believe how much wood there was. It’s a more quality build that way as well. That’s what my private inspector said.
viewtopic.php?t=86597