Browse Forums Building A New House Re: KDR - SE Melb - Simonds Flinders - PCI Done 608Apr 18, 2018 9:19 am Bri1234Interesting day Occupancy Permit this morning. Then we went to the house to break up some old concrete etc to put in the skip because SS has finished with it. Managed to trip and cut my knee on some rusty rebar stuff. Groan. Met a 4th concreter this afternoon who also says we don't need a drain/grate. Though he's knows SS from passing in the nearby estate and is going to talk to him, lol. I was leaning towards charcoal coloured concrete for the driveway but now this guy has been thinking exposed concrete. I'll add a pic of the sample of like. This afternoon we received our final invoice and statement to send on to the bank. Still not gas line. Getting a bit stressed but fingers crossed Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Occupancy permit!! Woooo!! I wish I had of gone for exposed concrete, it is such a nice look! I would be taking the concreters advice re: drain. If you're on a slope, you shouldn't need it. Provided the water drains away from the slab, your warranty remains valid. Re: KDR - SE Melb - Simonds Flinders - Waiting for PCI! 609Apr 18, 2018 11:06 pm It definitely is alot of info! Haha Yep 7 days to fix it all up, and it's great that it's only little touch ups and nothing major! Our house is going well. Yep all moved in and settled, apart from the landscaping side of things, which is stressing me out at the moment with all the rain last weekend. Our dog brought in ALOT of mud, considering the whole yard is just mud when it rains haha so we have had to take him for a walk every few hours for a toilet stop, which is quite annoying. So I'll be getting onto measuring and ordering of clean top soil and turf later this week to start that next week and weekend. No issues at all really, all appliances now work after the initial stuff ups, everything seems to be perfect! A feeling you will experience in a few short weeks when you move in to your new home That's fantastic. Very happy for you. Ohhh we're going to be in the same boat with 2 little dogs. I'm not looking forward to the mud. We haven't decided what to do with the yard yet. For the moment we just need some grass for the dogs. Still need to get the back fence replaced as well. I;m kind of ignoring that out of stress at trying to get quotes. Fencers must be seriously overworked at the moment to not want to quote. Re: KDR - SE Melb - Simonds Flinders - Waiting for PCI! 610Apr 19, 2018 8:47 am Bri1234It definitely is alot of info! Haha Yep 7 days to fix it all up, and it's great that it's only little touch ups and nothing major! Our house is going well. Yep all moved in and settled, apart from the landscaping side of things, which is stressing me out at the moment with all the rain last weekend. Our dog brought in ALOT of mud, considering the whole yard is just mud when it rains haha so we have had to take him for a walk every few hours for a toilet stop, which is quite annoying. So I'll be getting onto measuring and ordering of clean top soil and turf later this week to start that next week and weekend. No issues at all really, all appliances now work after the initial stuff ups, everything seems to be perfect! A feeling you will experience in a few short weeks when you move in to your new home That's fantastic. Very happy for you. Ohhh we're going to be in the same boat with 2 little dogs. I'm not looking forward to the mud. We haven't decided what to do with the yard yet. For the moment we just need some grass for the dogs. Still need to get the back fence replaced as well. I;m kind of ignoring that out of stress at trying to get quotes. Fencers must be seriously overworked at the moment to not want to quote. The mud is the worst part, especially when everything inside is so nice, new and clean haha We should have grass down by the end of next weekend, if all goes to plan..... Haha I think that's just fencers in general, overworked? Who knows.... but i agree, it is definately stressful when trying to get quotes for them, and then trying to get them to actually start is a whole other issue!! Are you meeting SS today or tomorrow for PCS? Re: KDR - SE Melb - Simonds Flinders - PCI Done 611Apr 19, 2018 9:46 am Yeah I’m not looking forward to it. We’ll have to sort out grass fast. No work from SS. Can’t see that the last things have been done yet 🙁. But they really shouldn’t take too long. We were there yesterday doing the nature strips and noticed some roof tiles had been delivered. Hmmmm Re: KDR - SE Melb - Simonds Flinders - PCI Done 612Apr 19, 2018 9:57 am We will have the same problem with two dogs, mud and needing grass and fences asap. Its already got me twitchy and the build hasnt started yet. Re: KDR - SE Melb - Simonds Flinders - PCI Done 613Apr 19, 2018 10:00 am Bri1234Yeah I’m not looking forward to it. We’ll have to sort out grass fast. No work from SS. Can’t see that the last things have been done yet 🙁. But they really shouldn’t take too long. We were there yesterday doing the nature strips and noticed some roof tiles had been delivered. Hmmmm I would assume that the roof is already completed? Haha strange..... Shouldn't take too long I would think. Ours (paint and touch ups) took about 4 working days. Re: KDR - SE Melb - Simonds Flinders - PCI Done 614Apr 19, 2018 10:32 am blackcat20We will have the same problem with two dogs, mud and needing grass and fences asap. Its already got me twitchy and the build hasnt started yet. lol the things we worry about. Re: KDR - SE Melb - Simonds Flinders - PCI Done 615Apr 19, 2018 10:35 am Bri1234Yeah I’m not looking forward to it. We’ll have to sort out grass fast. No work from SS. Can’t see that the last things have been done yet 🙁. But they really shouldn’t take too long. We were there yesterday doing the nature strips and noticed some roof tiles had been delivered. Hmmmm I would assume that the roof is already completed? Haha strange..... Shouldn't tke too long I would think. Ours (paint and touch ups) took about 4 working days. There are 2 roof tiles that are slightly up so I'm assuming they are to fix there. I also noticed that one side of the gable looks wrong. Will take a photo later on to show. Just got a call from SS. Apparently he went past last night and unlocked the front door for the bank valuation this morning. Valuer has turned up and the door is locked. Wasn't me so now I'm wondering who has been in. A nuisance though because he has to try and meet the valuer later today to let them in. Still no gas line. This is my biggest stress at the moment. Re: KDR - SE Melb - Simonds Flinders - PCI Done 616Apr 19, 2018 10:42 am Bri1234 Bri1234Yeah I’m not looking forward to it. We’ll have to sort out grass fast. No work from SS. Can’t see that the last things have been done yet 🙁. But they really shouldn’t take too long. We were there yesterday doing the nature strips and noticed some roof tiles had been delivered. Hmmmm I would assume that the roof is already completed? Haha strange..... Shouldn't tke too long I would think. Ours (paint and touch ups) took about 4 working days. There are 2 roof tiles that are slightly up so I'm assuming they are to fix there. I also noticed that one side of the gable looks wrong. Will take a photo later on to show. Just got a call from SS. Apparently he went past last night and unlocked the front door for the bank valuation this morning. Valuer has turned up and the door is locked. Wasn't me so now I'm wondering who has been in. A nuisance though because he has to try and meet the valuer later today to let them in. Still no gas line. This is my biggest stress at the moment. Ahh ok fair enough. Oh that is frustrating!! Hopefully he can get back there later today to let them in..... Still no gas line? Goodness me, they are seriously hopeless!! Re: KDR - SE Melb - Simonds Flinders - PCI Done 617Apr 19, 2018 6:57 pm After the valuer being locked out this morning I wasn't taking any chances this afternoon.
SS called to let me know he was going to unlock the front door on his way home and another valuer would drop in on her way home. Dropped the kids home front school and went and waited up at the house, lol. Waited an hour, she arrived and took 2 minutes, lol. But it's done so that's the main thing. She was going to email the report to the bank straight away. While there I had more time to wander around on my own. Found where a small piece of skirting was missing under the kitchen bench and some water under the laundry sink. Will call SS tomorrow morning. Still no gas line........ oh and I think it was a plasterer who locked the door, lol Re: KDR - SE Melb - Simonds Flinders - PCI Done 618Apr 19, 2018 8:11 pm Mud - dogs - mysteries locking of doors - still no gas line. I've been away from Homeone for a few days, so catching up and your thread, has made me laugh today - Thank You. You're really on the home stretch, with the valuer coming through, do you have a date as yet for settlement or anything to keep you sane? I can't get over how long it's taking for the gas line. I have a suspicion that mine was only requested Monday a week ago after the house had it's first clean. Look on the bright side of things - at least you can pick up your doggies and give them a quick rinse in the laundry sink - lol Re: KDR - SE Melb - Simonds Flinders - PCI Done 619Apr 19, 2018 10:07 pm Rachael13Mud - dogs - mysteries locking of doors - still no gas line. I've been away from Homeone for a few days, so catching up and your thread, has made me laugh today - Thank You. You're really on the home stretch, with the valuer coming through, do you have a date as yet for settlement or anything to keep you sane? I can't get over how long it's taking for the gas line. I have a suspicion that mine was only requested Monday a week ago after the house had it's first clean. Look on the bright side of things - at least you can pick up your doggies and give them a quick rinse in the laundry sink - lol lol, if we didn't laugh through this we'd probably cry. I'm going to email CRC tomorrow morning and ask about a settlement date. SS said the painters will be there Monday so I'm assuming settlement will have to be later in the week. I hope you don't have the same meter issue's we're having. It's frustrating because we can't book the driveway until the meter is in either. Lol very true. We purposely left the spray hose nozzle thingy tap in the laundry for doggy baths. Re: KDR - SE Melb - Simonds Flinders - PCI Done 620Apr 20, 2018 2:14 pm Waiting to hear from SS about a time for Monday to meet and sign off on PCI. All being well with that we have settlement Tuesday. I've had new houses built around me and found while many do the right thing - some of their sub-contractors don't. What do you mean by " ... even though I've stayed well… 2 1857 All the best. Let us know how you go. I will be having another meeting with builder tomorrow . Can't really finalise the plan yet 5 61458 Adding pool to KDR Build. During or after building plan approval Hi, we are doing a KDR on a downhill sloping block. Adding a pool increases the non-permeable area,… 0 75858 |