Browse Forums Building A New House Re: Metricon Winchester 28- Pre-construction 334Apr 13, 2018 12:31 am Our Bayside KDR Thread: viewtopic.php?f=31&t=78298 Re: Metricon Winchester 28- Pre-construction 335Apr 13, 2018 8:12 am Drew01 Tribe7 Final plans look great black cat . Gosh I hope your permit comes through it’s so painful waiting. That’s a good idea about your tap too, you do not want people helping themselves to your water. We reckon someone filled their pool from our tap after demo, as we had a quarter with an average usage of several thousand litres of water per day. And the meter wasn't connected to a tap, just a 26mm (?) threaded outlet... Had to pay it, as it was our word vs the water company... People are so crap! I noticed our usage increased between our visits, which I assume was the idiots washing out their concrete truck. Happy Friday 13th! Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ SaveSave Re: Metricon Winchester 28- Pre-construction 336Apr 13, 2018 8:26 am Drew01 Tribe7 Final plans look great black cat . Gosh I hope your permit comes through it’s so painful waiting. That’s a good idea about your tap too, you do not want people helping themselves to your water. Had to pay it, as it was our word vs the water company... Gee drew that’s pretty damn average. You can’t even it prove it wasn’t you. Fingers crossed your build starts soon so they can all go away and leave you tap alone Re: Metricon Winchester 28- Pre-construction 338Apr 13, 2018 8:34 am Tribe7 Ooohhhhhwwwwwe that’s awesome news blackcat what’s next? Certificate of commencement? I have no idea! I know we still have two variations that need to move through the system (they can only do one at a time apparently ), but contract says they have three weeks to start from now. Re: Metricon Winchester 28- Pre-construction 340Apr 13, 2018 9:10 am Me too. Its cancelling a air con unit and adding obscuring to two windows, so I would hope that doesnt slow them down getting started. Ideally you would engage a landscaper to give you some insight what they may need in the space to make your vision come to life… 1 14522 Yes, I was happy with the work, bar a few small things. Overall, communication could have been better though. However, I found them reliable and did good work at a… 4 63360 Ha all, I am now about half way (maybe a bit more) through my build with Carlisle Homes - double-storey knockdown/rebuild project. So I am now doing my due diligence and… 0 4279 |