"new sewer house connection point required to lot 2 apprx connection point shown"
Would think all new blocks would require connection to sewer in the back of the block :S
This may be a bit late but...
All new subdivisions include sewer lines - these are likely to be located in the road reserve (if your block slopes towards the road) or in an easement (if your block slopes away from the road). These common sewer lines are not the same as "connections" though, which is where your sewer system tees into the nearest common line. This is probably because the location of the connection will be dictated by your house layout and siting, therefore there's no point in the subdivision developer putting in random connections ahead of time.