Browse Forums Building A New House Re: Our First Dream Home 61Jan 22, 2018 5:34 am Masterton Overture 17/12/14 - Handover ...... we got the keys !! blog - http://www.mcnamaraadventure.blogspot.com Our First Dream Home Week 2 Slab - G&P Builders 77Jan 31, 2018 5:09 pm Yay! Hopefully they’ll be able to fix the bath waste location. We are having a free standing cabinet in the powder room so the drain was supposed to be recessed behind the wall instead of coming up through the floor but wasn’t. Our builder can and will rectify this so sounds like it’s not impossible to do stuff like that after the slab has been poured Re: Our First Dream Home Week 2 Slab - G&P Builders 78Jan 31, 2018 6:55 pm Dani_J Yay! Hopefully they’ll be able to fix the bath waste location. We are having a free standing cabinet in the powder room so the drain was supposed to be recessed behind the wall instead of coming up through the floor but wasn’t. Our builder can and will rectify this so sounds like it’s not impossible to do stuff like that after the slab has been poured Thanks Dani, that’s interesting I thought it would be near impossible to fix. My husband said maybe they planned to put it on a platform like they have at their display. Our spec specifically says no allowance for it to be on a platform though. I’m worried being on a platform looks a bit busy but I’m happy to have it if it saves the integrity of the slab. Building our first custom dream home. https://r.tapatalk.com/shareLink?share_ ... are_type=t Re: Our First Dream Home Week 2 Slab - G&P Builders 79Feb 01, 2018 9:34 pm Congratulations on your slab and progress Sparrownest. I hope you get a quick response about your bath waste. I think some free standing baths have a cavity below the base of the bath to be able to deal with wastes points not lining up. Can I ask how high the back of your pad is? Will you retain the whole back? Re: Our First Dream Home Week 2 Slab - G&P Builders 80Feb 02, 2018 12:50 am Thank you Tribe. I’m glad to see you back! The builder emailed me back about the bath waste and said it is their error and they will cut out part of the slab and reposition the pipe. I’m a bit worried about the integrity of the slab but they have assured me it will be fine. Building our first custom dream home. https://r.tapatalk.com/shareLink?share_ ... are_type=t Hi All, we are starting to think of building with Masterpiece Builders in Victoria, has anyone had any feedback or experience with them 0 14609 1 10195 Hey Setsquare Firstly thank you to all the kind comments here. Now to answer your question, it comes down to what budget you have. New South homes who are based at… 3 2156 |