Browse Forums Building A New House Re: KDR with Sekisui house 742Aug 19, 2016 8:27 pm Received final variation and invoice. Over to bank, they'll revaluate house. 23/06/2014 - Paid deposit 21/07/2014 - ordered the survey and tender 13/08/2014 - soils test sample taken 14/08/2014 - survey done today 30/08/2014 - Pre-color consultant aptmnt Re: KDR with Sekisui house 743Aug 25, 2016 5:43 pm Yay! Two days before final presentation we have a new ( previous ) SS. so the count is 6 now. 23/06/2014 - Paid deposit 21/07/2014 - ordered the survey and tender 13/08/2014 - soils test sample taken 14/08/2014 - survey done today 30/08/2014 - Pre-color consultant aptmnt Re: KDR with Sekisui house 744Aug 25, 2016 8:14 pm So excited for you! Wow! Don't forget to post pictures. Hopefully all goes well with SS no. 6! Re: KDR with Sekisui house 745Aug 25, 2016 9:00 pm Can't wait to see pictures, whats the deal with all the SS's? sekisui build viewtopic.php?f=31&t=75060&p=1573965#p1573965 Building a sekisui house in Holmesville NSW viewtopic.php?f=31&t=75060 Re: KDR with Sekisui house 746Aug 25, 2016 10:01 pm six!! Haha far out, that's really crazy. Pretty amazing your house is getting anywhere with so many changes in hands. So good news it is, it could be so much worse. And SO CLOSEEEE!!!!!!! Yippee! You must be beside yourself Re: KDR with Sekisui house 747Aug 26, 2016 8:58 am This one was the third one returning since the 5th decided to leave but the 5th was super quick with everything, he actually brought it to closure at this time othrwise not sure how much more time it would have taken. Dealing with bamk for revaluation of house. 23/06/2014 - Paid deposit 21/07/2014 - ordered the survey and tender 13/08/2014 - soils test sample taken 14/08/2014 - survey done today 30/08/2014 - Pre-color consultant aptmnt Re: KDR with Sekisui house 748Aug 30, 2016 12:50 pm Some photos Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ 23/06/2014 - Paid deposit 21/07/2014 - ordered the survey and tender 13/08/2014 - soils test sample taken 14/08/2014 - survey done today 30/08/2014 - Pre-color consultant aptmnt Re: KDR with Sekisui house 749Aug 30, 2016 12:52 pm Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ 23/06/2014 - Paid deposit 21/07/2014 - ordered the survey and tender 13/08/2014 - soils test sample taken 14/08/2014 - survey done today 30/08/2014 - Pre-color consultant aptmnt Re: KDR with Sekisui house 750Aug 30, 2016 12:52 pm It is looking amazing you must be so happy. Are they 40mm bench tops, I wish our budget could have allowed them. sekisui build viewtopic.php?f=31&t=75060&p=1573965#p1573965 Building a sekisui house in Holmesville NSW viewtopic.php?f=31&t=75060 Re: KDR with Sekisui house 751Aug 30, 2016 12:54 pm Ordered some LIFX original bulbs, inspired partly by Clintdb amd partly they are discounted 23/06/2014 - Paid deposit 21/07/2014 - ordered the survey and tender 13/08/2014 - soils test sample taken 14/08/2014 - survey done today 30/08/2014 - Pre-color consultant aptmnt Re: KDR with Sekisui house 752Aug 30, 2016 4:08 pm Wow vivmak...nice photos! Is PCI now done? Hopefully no major issues so you have keys asap! Yay! Re: KDR with Sekisui house 754Aug 30, 2016 8:27 pm Every pics looks wonderful vivmak, lots of room for more parking on the left side of your home....space for future boat. I have pick same colour for kitchen's splash back. viewtopic.php?=31&t=81624 Re: KDR with Sekisui house 755Aug 31, 2016 6:12 am mim_feher It is looking amazing you must be so happy. Are they 40mm bench tops, I wish our budget could have allowed them. sekisui build viewtopic.php?f=31&t=75060&p=1573965#p1573965 Thanks. They are 40 mm. 23/06/2014 - Paid deposit 21/07/2014 - ordered the survey and tender 13/08/2014 - soils test sample taken 14/08/2014 - survey done today 30/08/2014 - Pre-color consultant aptmnt Re: KDR with Sekisui house 756Aug 31, 2016 6:14 am EPaul888 Wow vivmak...nice photos! Is PCI now done? Hopefully no major issues so you have keys asap! Yay! Yes. PCI done. Some minor and atleast ine medium size issue with the aircon panel being fitted on yhe stairs ratber than at a stable platform. They think it js as per plan buy it is not and is dangerous to operate standing on stairs. 23/06/2014 - Paid deposit 21/07/2014 - ordered the survey and tender 13/08/2014 - soils test sample taken 14/08/2014 - survey done today 30/08/2014 - Pre-color consultant aptmnt Re: KDR with Sekisui house 757Aug 31, 2016 6:15 am yvonneh Looks great! Love the French doors Thanks. Hopefully I can build a deck outside french door for morning cuppa 23/06/2014 - Paid deposit 21/07/2014 - ordered the survey and tender 13/08/2014 - soils test sample taken 14/08/2014 - survey done today 30/08/2014 - Pre-color consultant aptmnt Re: KDR with Sekisui house 758Aug 31, 2016 6:16 am shazaw Every pics looks wonderful vivmak, lots of room for more parking on the left side of your home....space for future boat. I have pick same colour for kitchen's splash back. viewtopic.php?=31&t=81624 No scope for boat in budget anymore. A few veggie patches more likely. 23/06/2014 - Paid deposit 21/07/2014 - ordered the survey and tender 13/08/2014 - soils test sample taken 14/08/2014 - survey done today 30/08/2014 - Pre-color consultant aptmnt Re: KDR with Sekisui house 759Sep 06, 2016 9:05 am First floor flooring Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ 23/06/2014 - Paid deposit 21/07/2014 - ordered the survey and tender 13/08/2014 - soils test sample taken 14/08/2014 - survey done today 30/08/2014 - Pre-color consultant aptmnt Re: KDR with Sekisui house 760Sep 06, 2016 9:07 am Unnecessarily laege main room with WIR Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ 23/06/2014 - Paid deposit 21/07/2014 - ordered the survey and tender 13/08/2014 - soils test sample taken 14/08/2014 - survey done today 30/08/2014 - Pre-color consultant aptmnt We were lucky in that our old house was so small (86 square metres) compared to the new house, they were able to take enough readings around the old backyard house before… 8 38089 The biggest challenge will be if you take out a loan and then run out of money - you'll have an incomplete security and lenders do not like this so you can get stuck.… 2 19707 Hi, I am looking into doing a KDR in Melbourne and am contemplating using Kialla Homes. I am looking for feedback on them from others who have built with them. 0 13982 |