Browse Forums Building A New House Re: Building Lexington Belle Q2 with Henley 22May 08, 2015 4:57 pm Building Lexington Belle Q1 With Henley in Merrifield, Mickleham. viewtopic.php?t=77094 Getting There.... Re: Building Lexington Belle Q2 with Henley 24May 08, 2015 7:34 pm Building Lexington Belle Q1 With Henley in Merrifield, Mickleham. viewtopic.php?t=77094 Getting There.... Re: Building Lexington Belle Q2 with Henley 25May 18, 2015 11:42 pm Building Lexington Belle Q1 With Henley in Merrifield, Mickleham. viewtopic.php?t=77094 Getting There.... Re: Building Lexington Belle Q2 with Henley 26May 19, 2015 11:13 pm My Build Journey - Mainvue Amalfi 530 in South Eastern Melbourne https://forum.homeone.com.au/viewtopic.php?f=31&t=75810&p=1353804&hilit=mainvue+amalfi#p1353804 Re: Building Lexington Belle Q2 with Henley 27May 20, 2015 2:24 am Our build thread: viewtopic.php?f=31&t=77196 Re: Building Lexington Belle Q2 with Henley 28May 20, 2015 1:10 pm Building Lexington Belle Q1 With Henley in Merrifield, Mickleham. viewtopic.php?t=77094 Getting There.... Re: Building Lexington Belle Q2 with Henley 29May 20, 2015 1:12 pm Building Lexington Belle Q1 With Henley in Merrifield, Mickleham. viewtopic.php?t=77094 Getting There.... Re: Building Lexington Belle Q2 with Henley 30May 20, 2015 1:23 pm I also need to decide on hot water system Standard inclusion Chromagen/Solar First 9202VOBP11T20P08 -200 Litre Tank plus 6 star gas instantaneous booster (20 litre per minute. This unit includes tempering valve. Upgraded One = $1366 extra Chromagen Eternity Instantaneous Hot Water System. Includes 3 controllers: one in kitchen, one is ensuite and one in bathroom in lieu of standard Hot water system and solar panels. This item is an extra cost of $1,366 Whats good i really dont know. is it worth it or standard one is enough. Also will it add value in re-sale? Building Lexington Belle Q1 With Henley in Merrifield, Mickleham. viewtopic.php?t=77094 Getting There.... Re: Building Lexington Belle Q2 with Henley 31May 20, 2015 2:23 pm Haven't thought about step-down to garage, thought it was included. We've opted for the upgraded hot water system - we've used it before and it made life so much easier for us, and no accidental burns. Only thing is a lot of those units only go to a max regulated temp of 50 degrees. Don't think it'll make much diff on resale value though. Re: Building Lexington Belle Q2 with Henley 32May 24, 2015 1:45 pm I have changed the house from belle q2 to belle q1......very happy now and NOT getting lot of upgrades which i was going for before such as upgraded insulation, upgraded hot water etc... someone advised and we liked the value. Building Lexington Belle Q1 With Henley in Merrifield, Mickleham. viewtopic.php?t=77094 Getting There.... Re: Building Lexington Belle Q2 with Henley 33May 25, 2015 10:04 am Nice work on the upgrade, sounds like what we done. Except we've started getting a bit excited with extras too so far... Re: Building Lexington Belle Q2 with Henley 34May 27, 2015 9:06 pm Colour appointment done. Lot of upgrades, cant even remember. waiting for colour consultant to email everything. Kitchen combination : - parchment and seductive limba combination in gloss. Different colour scheme in wet areas. feature tiles in kitchen, en-suite, bathroom and powder room. tan scheme for external double door entry upgraded all internal doors upgraded kitchen tap and all other taps upgraded front door handle/lock there was a lot but cant think of anything now. changed pumice to parchment in last minute. so confused about it still. is parchment is same as white? Building Lexington Belle Q1 With Henley in Merrifield, Mickleham. viewtopic.php?t=77094 Getting There.... Re: Building Lexington Belle Q2 with Henley 35May 28, 2015 10:15 am Have to post pics of your choices! Sounds like you got a few good extras. Which internal doors did you upgrade to? Re: Building Lexington Belle Q2 with Henley 36May 31, 2015 9:37 pm snydeHave to post pics of your choices! Sounds like you got a few good extras. Which internal doors did you upgrade to? I am really very confused. still thinking to change colours. not even sure if i am allowed to. kitchen colour - just refer to the cupboards near chimney - http://www.brilliantkitchens.com.au/ima ... g_1869.jpg . This colour called as "seductive limba". this picture is just for reference. MAY BE THESE ARE DIAMOND GLOSS OR 2 PAC FINISH BUT MINE IS CRYSTAL GLOSS. The cupboards are wider not lengthier like this. 2 on each side of the chimney. added "parchment" colour to the rest of the kitchen. Parchment is this - http://www.bjwalshdesigns.com.au/galler ... 0large.jpg External DOUBLE door is this - https://www.corinthian.com.au/Products/ ... na-LUM-5NS Internal doors are - https://www.corinthian.com.au/Products/ ... n-FUSP-1VW but i am going to withdraw from this and use normal doors instead. Building Lexington Belle Q1 With Henley in Merrifield, Mickleham. viewtopic.php?t=77094 Getting There.... Re: Building Lexington Belle Q2 with Henley 37May 31, 2015 9:42 pm If you're unhappy with them, you can always change them or request another colour appointment, as long as you haven't signed contract you can keep redoing it until you're happy. We seen people coming in for 're-colour appointments' while we were there. Re: Building Lexington Belle Q2 with Henley 38May 31, 2015 9:47 pm snydeIf you're unhappy with them, you can always change them or request another colour appointment, as long as you haven't signed contract you can keep redoing it until you're happy. We seen people coming in for 're-colour appointments' while we were there. Yeah, i have to do lot of changes. I have go there again but have to be prepared this time. Everything is an upgrade. Need to cut on some upgrades. Also, very important thing and i think it can help you as well as i think i read on your forum that you are also going for tan scheme. The bricks in that are - Blackwood from Austral. It looks totally different on their website - http://australbricks.com.au/vic/bricks/homestead/ Building Lexington Belle Q1 With Henley in Merrifield, Mickleham. viewtopic.php?t=77094 Getting There.... Re: Building Lexington Belle Q2 with Henley 39May 31, 2015 9:54 pm Think you'll be fine with the Blackwood bricks. The samples will vary based on photo and lightng settings, they're quite nice in person. Here's a better photo of the Austral Blackwood bricks: viewtopic.php?f=31&t=3737&start=140#p602598 I think for things like that, it needs to be seen on a larger scale. Re: Building Lexington Belle Q2 with Henley 40May 31, 2015 10:45 pm snydeThink you'll be fine with the Blackwood bricks. The samples will vary based on photo and lightng settings, they're quite nice in person. Here's a better photo of the Austral Blackwood bricks: viewtopic.php?f=31&t=3737&start=140#p602598 I think for things like that, it needs to be seen on a larger scale. Thanks for sending this through. These looks good. Building Lexington Belle Q1 With Henley in Merrifield, Mickleham. viewtopic.php?t=77094 Getting There.... At similar stage, seems like all builders these days try to make some hidden money from site costs. Will know more as it proceeds. Try out maximising your initial costs… 1 29517 Renee I would imagine Sydney rates for Bondek would be similar, typically though for most things Melbourne has been historically a touch lower. But here we would… 1 34856 |