Browse Forums Building A New House Re: Masterton Homes - The next thread 4.0 129Aug 02, 2013 9:07 pm 28/5 3.5K 1/8 Final Plans 20/9 Contracts/Selections 29/10 Council appr, CC 15/11 Scrape, peering 21/12 Slabbed, framed, bricks start 22/1 Bricks & roof comp 20/2 Lock up 5/4 Moved in and PCI Re: Masterton Homes - The next thread 4.0 134Aug 03, 2013 10:50 am Deposit paid to Masterton 30/05/13 Contracts signed and 5% deposit paid 09/10/13 CDC Approval 14/11/13 Slab 22/01/14 Frame 18/02/14 Brickwork 14/03/14 Roof 22/03/14 Lock Up 11/04/14 Re: Masterton Homes - The next thread 4.0 137Aug 03, 2013 7:04 pm Deposit paid to Masterton 30/05/13 Contracts signed and 5% deposit paid 09/10/13 CDC Approval 14/11/13 Slab 22/01/14 Frame 18/02/14 Brickwork 14/03/14 Roof 22/03/14 Lock Up 11/04/14 Re: Masterton Homes - The next thread 4.0 140Aug 03, 2013 8:32 pm Yay action at the house this week. Painters visited. Front door (what I assume is the first coat only) stained!!! first coat through out the house also done, assuming upstairs as well but couldn't actually see upstairs... 4 17294 i imagine you also have another contract with an architect? and yeah, whatever other's said about special conditions and appendices 16 16841 Hi all I am looking to run a water line under my concrete footpath which is directly next to my home, was seeing if this is possible without cutting the entire section… 0 20841 |