So I thought I'd document the process here.
We're calling it a studio as it will be used as an artists workshop. Art that can range from intricate jewellery to big chunks of scrap metal. To give you an idea, here is a pic of the fence we recently put up around the house to help keep the kangaroos out.
So, we decided on a site about 50m from the house, close enough to run power and water. It's fairly level requiring only about half a metre of retaining wall at its lowest point.
March 2014. I sketched up some plans with Google Layout and put in an application with the council for planning permission and sent off my plans to an engineer to get them stamped. Still waiting for a response from both.
Meanwhile we started making mudbricks. It has been an unusually dry summer and the dam was very low making it easy to get the tractor in and dig up plenty of mud. In a pit, we mixed the mud with old hay and proceeded to shovel it into moulds, drying them in the shade.
It didn't help when an emu came by a walked on the soft mudbricks.
This is the first time either of us has tried making mudbricks and the initial results were a bit "lumpy". But as we progressed we refined our technique and improved our product.
We calculated the need for about 900 mudbricks. We now have 841 stored in the shed. The rain started last weekend and the remaining 60 are still trying to dry enough to be moved. Hopefully this weekend.
As they've dried the smell of wet mud has gone.
We also sifted a few tonnes of clay/soil from the same site and bagged it up ready to make the mud mortar to hold all those mudbricks together.
I made up a batch of this mortar and it looks and works just like the "real" thing although it does eventually break down when left in the rain.
Can't wait to actually lay some wall....but there is so much to do before we get that far. We haven't even heard back about the building permit yet so can't even properly clear the site.
Nice to come across another "crazy" builder here. Certainly the DIY path is not for everyone but if you can do it, the rewards are well worth the effort.
I solo built my house on a hill too.
Built from stone and timber cut from the site. Instead of going up on stilts I blasted a chunk out of the rocky hilltop and built into the hill. But my efforts are no match for your precision and skill. Very impressive!
Still waiting for council approval. I rang last week but I'm still waiting for the promised call back.
The last of the 900 mudbricks are now in the shed. That's one job down.
Still waiting for council approval. I rang last week but I'm still waiting for the promised call back.
Still waiting for council approval. I rang last week but I'm still waiting for the promised call back.
I bet your glad to get them done and all undercover - especially with the weather forecast for the rest of the week
And then last night the rains really came. We added more than 10,000 litres to our depleted drinking water supply. The paddocks are starting to turn green again and Lake Chittering actually has some water in it.
The countryside is going to look beautiful after all these rains!
Are you constructing with Post & Beam or are the mud bricks loadbearing. ?
Very difficult to get the multiple layers of paint off the corners and edges around the glass but I think they will come up nicely.
Related
26/12/2023
1
I would suggest you simply go and talk to council about your proposal, most councils are getting onboard with ancillary dwellings. There is no benefit in keeping it…
7/05/2023
0
Is it possible to render an old corrugated iron shed.I have heard that it can be done if it is covered with chicken wire first.Not sure of the ratio of the render mix and…
15/06/2023
2
Thanks. Yeh ideally that would have been good, but have progressed too far now. Hoping some well placed internal walls fixed up into the battens will provide some…