Browse Forums Owner Builder Forum Re: Side and rear setbacks 5Dec 12, 2019 3:47 pm Stewie D No, I know exactly what you are saying. If the NCC and council regs say 900mm from the boundary to the wall and you end up with only 800mm then it is non-compliant. However, as per my first post " The surveyor can also certify it as an alternate solution but you may have to clad that wall plus eaves etc out of non-flammable materials. ". The 900mm is there as a way of a fire break between buildings should one of them become aflame. When you go less than that you may be required to increase the fire resistance of your house. Stewie My house is already cladded using masterwall. No bricks My land is 260m2 (10m x 26m) located in claymore NSW. Under campbelltown council. I know in general the following setbacks would apply ground floor side setback =… 0 7404 Hey everyone Not for me or anyone I know, just generally interested. For a single allotment house, are you allowed to take the fence on both sides of your house and… 0 21590 |