Browse Forums Owner Builder Forum 1 Apr 08, 2019 7:21 pm Hi All, Im going over our plans before locking everything in, and Ive noticed our designed has specified a 100mm step up from finished ground level, while the engineer has specified a minmium of 150mm freeboard. Am I wrong in thinking that these two figures should be the same? Also - while on the topic. Current FFL and FGL means a cut of about 250mm across the site. I am looking to design an entry door to a lower ground basement that has 2200mm between the external entry height to FFL of the ground floor. This door will provide an… 0 12883 I recently went through a similar renovation and move scenario when updating our family home. We also swapped some rooms around and tackled a major… 2 11788 Hi, you've probably already resolved this, however, Commbank will probably pay the funds to you after you send evidence the work is done regardless the change in the quotes. 1 36599 |