Background!
It was around June 2012 when I decided I wanted to be more independent and move into my own house whilst also reducing my travel time from my current residence in Rockingham to closer to Perth where I work. I had a look around the Cockburn area (about 22km south of Perth) for what land was available and visited the Honey-wood estate, Hammond Rise, Piara waters, Atwell and Aubin Grove. I finally decided on Hammond Rise (about 4km south of Cockburn) and secured a North-facing 501 square metre block. I chose this estate as I thought the developer had done a very good job in the layout and the price was also about right. I did consider the Honey-wood estate as well but this was out of my price range =P
After I had visited a few display villages in Lakelands, Baldivis and Honey-wood I decided to go with Content-Living and build their Scottsdale house plan. I liked the a lot of features of the design such as:
-Laundry being located away from all bedrooms
-Very large and open combined meals/living/family room
-Store room in Garage
-The Price!
Here is the original house-plan!
And Elevation
And here is the altered houseplans!
And also my own altered elevation (Self drawn
Alterations & Variations
-Upgrade front door to 1200mm Corinthian Infinity INFWS 6G Hinged door
-Reduced the garage storage space to allow space for a walk in pantry
-Additional Stylus Venecia Basin to WC 1
-Additional doors on all walk in robes
-Upgrade to two above counter sinks in en-suite and also extending the bench-top the whole length of the wall
-Increased shower size
-Upgrade Laundry tub to Clark Eureka 45L Stainless Steel Trough
-Upgrade cook-top to cast iron hot plate
-Chrome floor wastes (wet are drain covers)
-Wood look garage door
-Enlarged living room windows
-Additional external lights and many more (GPOs) power points!
-Upgrade standard pavers to Stonewash Pavers for driveway (brikmakers)
-Upgrade to Ceramic toilet pans
I spent about 3 hours at pre-start which was pretty straight forward. The pre-start officer was pretty good, and made a few recommendations that I accepted, such as flipping the side that the WIR doors open (so they opened against the wall). I also decided to allow the builder to do the driveway, crossover and the gully drain and accompanying soak-well as it wasn't too much more expensive than doing it afterwards.
Afterthoughts
The upgrade and upsize of the front entry door was actually quite a major one. To make way for the wider door, we had to increase the entry hall width to suit. This meant pushing the study and garage outwards, which increases the house footprint by a few square metres. Overall I was happy with this as it meant I also had a slightly larger house
The store room was a good feature of the original house plan, but I really wanted a walk in pantry, thus I reduced the storeroom size to make way for a walk in pantry. There's still about 700mm left of storage recess in the garage which will still fit a small workbench in
I also removed that 1120mm 22c high wall near the kitchen as i wanted that area to be as open as possible.
I am having second thoughts about how I have changed the layout of the en-suite bathroom. Originally I thought the en-suite was a bit wasteful by having the toilet in a separate room. So my new layout moved the toilet out and then made room for a bigger shower. I also added an extra basin and then extended the bench top the whole length of the wall. Now (3 months later) I'm thinking that the en-suite looks too small and cramped and I wish I had made it more spacious!
Timeline!
15 July 2012 Offer of purchase for Land (Deposit Placed)
30 July 2012 Signed Preparation of drawings agreement with Content-Living (deposit Placed)
02 October 2012 Pre-start!
26 October 2012 Settlement on land
05 December 2012 Pad Levelled and rebar delivered
15 December 2012 Footings poured and rebar laid
17 December 2012 Slab poured!
22 December 2012 Window frames and port-a-loo delivered
--Christmas break!-- =(
09 January 2013 Bricks delivered!
11 January 2013 Walls Drawn out on slab & slab sides sealed up
Previous stages photos!
Pad Levelled Stage
Shot from the road, key points are Stormwater drain centre, retaining wall at back and there is a lightpost on the left boundary
View from the corner of the garage
Neighbour's house across the road already with roof on! Grrr!
Footings Poured and Rebar laid Stage
Garage on the Left, Study and entrance in the middle and the Master bedroom on the right
A view showing the laundry at the closest and the master bedroom at the far back
Footings for Alfresco, the retaining wall is about 1m high at the back
Slab Poured Stage went straight after work, poured only hours earlier!
View from front
View front master bedroom corner
Shot from laundry, facing master bedroom
Shot from laundry again but showing garage on right
More Photos to come guys!
Overall I am very happy with the service from Content-Living. Their sales representive in the Lakelands display village was very helpful and could price all alterations straight on the spot! And the house of course so far has come under budget
I'll refine this a bit more tommorow and post some real photos I took before, it's bed time now