Browse Forums Building A New House Re: Who is building with Beechwood 1343Oct 11, 2011 11:47 am Beechwood Homes Muscle Creek, Hunter Valley Paid Deposit Oct '10 Colour selec/Contract 17 Aug '11 28 days start- 12 Sept Bricks start 12 Jan Walk-through 12 April Re: Who is building with Beechwood 1345Oct 11, 2011 12:41 pm Beechwood Homes Muscle Creek, Hunter Valley Paid Deposit Oct '10 Colour selec/Contract 17 Aug '11 28 days start- 12 Sept Bricks start 12 Jan Walk-through 12 April Re: Who is building with Beechwood 1349Oct 11, 2011 7:32 pm 20/4 - Earthworks 25/5 SLAB 9/6 Frame 21/6 Roof 5 - 22/7 Bricking 1/8 Gyprocking 16 - 18/08 Faulty Trusses repaired 17/08 Kitchen in 07/09 Tilers 15/09 Painters 30/9 Plumbers finished 7/10 Settled Re: Who is building with Beechwood 1350Oct 11, 2011 7:48 pm Our Acreage Build The Lakeview Lodge - Beechwood Homes 01/04/10 YES 2010 - Deposit paid 23/09 - PCI CANCELLED 28/09 - PCI - will it happen.-18 months later 07/10/11 - ITS OURS..WOOHOO Re: Who is building with Beechwood 1351Oct 11, 2011 7:50 pm Our Acreage Build The Lakeview Lodge - Beechwood Homes 01/04/10 YES 2010 - Deposit paid 23/09 - PCI CANCELLED 28/09 - PCI - will it happen.-18 months later 07/10/11 - ITS OURS..WOOHOO Re: Who is building with Beechwood 1352Oct 11, 2011 9:28 pm 2.2acredream Had the kitchen guy turn up to fix a chip in the kickboards and you wouldn't bloody believe it but he has spilled something on the stone benchtops that has left a stain we can't get off! It's soaked into the stone!!! Acre2.2 - my stone got stained also by the plasters mixing up there mix on my bench with no plastic or covering, I was spewing when I saw it, anyways it left yellows stains, so I called Apollo who put me in touch with Caesarstone and they advised to use JIF on it and if that didnt work they can send out a special cleaning kit made by them as in Caesearstone, but the JIF seemed to work and I can now hardly see the marks, apparently the stone is pourus and absorbs everything so as soon as you spill one thing you need to wipe or clean it up straight away apparently coke is a shocker for staining it also......have to say for what you pay for it, it not a "durable" as what I thought, I love the look but not loving the use of it.......... Land Settlement - 1/10/10 Slab 23/3 Frame 14/04 Roof Tiling 29/4 Bricks 5/5 Electrical Rough In 27/5 Gyprocking 23/6 Kitchen install 29/6 Tiles 14/7 Paint 4/8 Plumbing 27/7 Were in 1/9 Re: Who is building with Beechwood 1353Oct 12, 2011 9:27 am guys, I was reading something the other day about benchtops and it said that stone benches need 'sealing' every 12 months. I'm not sure what with though. might be worth looking into. Terrible that it stains so easily though! Building Beechwood Genesis Muscat (modified) Contract signed- April 19 Benching done- May 19 Piering done- June 27 Slab Plumbing- July 1st Slab poured- July 6th Frame finished- August 11 Re: Who is building with Beechwood 1354Oct 12, 2011 9:37 am Hello Everyone, very useful info indeed. We're building or should I say we were building with Westminster Homes till they went into liquidation . Like many of you, we too wanted Caesar stone bench tops, as our current Beechwood home that was built 20 yrs ago has laminate benchtops. It never really crossed my mind that Caesar Stone can stain, I thought it was like marble. So , a very big thankyou for bringing this to our attention, & will look into sealing, Re: Who is building with Beechwood 1355Oct 13, 2011 11:25 am Thanks everyone for the comments and Jiff (and a bit of elbow gease) did the job!!! You can't even tell where the stain was!! Today the floating floors are being finished off and the carpet is going down! Tonight will be cleaning all the dust out of the cupboards and tomorrow we start moving things in! We still have a few issues. Our metal flyscreans went up yesterday but they look as though someone has walked over the steel gauze and it's all dented! The cleaners have to come back to do our back entertainment area again. There is still grout, paint and dirt that they haven't cleaned off (to be honest we haven't been at all impressed with the cleaners). We're still waiting on our toilet roll holders that hadn't been ordered, the painters have to come back and finish their 'touch ups' of which there are ALOT (REALLY not impressed with them either) and there are still come cosmetic stuff on the brickwork that needs to be finished off. Nothing big but stuff that needs to get finished off. Can't wait to move in!!!! It's still a bit serreal that we've finally gotten here. As some of you know there are times it feels like it's never going to be done but we're here! 20/4 - Earthworks 25/5 SLAB 9/6 Frame 21/6 Roof 5 - 22/7 Bricking 1/8 Gyprocking 16 - 18/08 Faulty Trusses repaired 17/08 Kitchen in 07/09 Tilers 15/09 Painters 30/9 Plumbers finished 7/10 Settled Re: Who is building with Beechwood 1356Oct 13, 2011 12:14 pm Well Done Anna.....you finally did it!! You and your family will be very happy Now the fun starts with the outside of the house Good luck with everything just starting Lake View Lodge - Beechwood deposit 17/08/09 Council April 10 signed contract 11/06 earthworks started 9/07 slab completed 8/09/10 Frames 21/09/10 bricking finished 13/10/10 roof 22/10/10 Gyprock 22/11/10 Tiles bathroom 21/12/10 Kitchen in 21/12/10 Painting 09/02/11 handover 11/03/11 We are in 15/03/11!!!!!!!! http://kathdom.blogspot.com/ Re: Who is building with Beechwood 1357Oct 13, 2011 1:25 pm Sounds just like us Anna Still waiting on our splashback. Cant wait to see pic once the floors are down Our Acreage Build The Lakeview Lodge - Beechwood Homes 01/04/10 YES 2010 - Deposit paid 23/09 - PCI CANCELLED 28/09 - PCI - will it happen.-18 months later 07/10/11 - ITS OURS..WOOHOO Re: Who is building with Beechwood 1358Oct 13, 2011 1:37 pm Congrats Anna! Enjoy your beautiful new home. Well, here are some photos of our block. First ones are of our gold encrusted fill. Second ones taken this morning with the bulldozer excavating. We have now been told that we are up for DOUBLE the amount of piers. Lovely. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ DH with one of our regular visitors. Ewww! Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Youngest son on the FILL! Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Our back yard. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Bulldozer photos! Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Beechwood Homes Muscle Creek, Hunter Valley Paid Deposit Oct '10 Colour selec/Contract 17 Aug '11 28 days start- 12 Sept Bricks start 12 Jan Walk-through 12 April Re: Who is building with Beechwood 1359Oct 13, 2011 3:29 pm YAY! 2.2! Its almost over! Must be so exciting to finally be moving in! Moon River- Your block is just gorgeous. Bet you can't wait to string a hammock between some of those gorgeous shady trees. Love it. How much land have you got? Well, our gyprock was booked to be done this week, eaves were supposedly booked for last week, but we still have neither... Not sure what the story is.. We do have most of the insulation installed though. For those who are finished, what comes after the gyprock? Is that the kitchens and bathrooms?? Building Beechwood Genesis Muscat (modified) Contract signed- April 19 Benching done- May 19 Piering done- June 27 Slab Plumbing- July 1st Slab poured- July 6th Frame finished- August 11 Re: Who is building with Beechwood 1360Oct 14, 2011 5:07 pm We have a dunny!!!! Am so excited. Moon river, seems we are following you in the build process. McKeachies Run, Aberglasslyn Deposit paid 11th April Land registered 6th June Land settled 20th June Colour selections and contract signed 5th August Commencement letter received 26th September I do enjoy the drama:-D In his latest two videos he has started bringing security guards to site, I am waiting for the punch on to begin lol 6 46230 Hey guys building a new place through a volume builder and just wondering if i should complain to the site supervisor as we just had plasterboard installed. Looks like… 0 11563 |