Browse Forums Building A New House Re: Carlisle KDR site cost after second soil test 9Sep 28, 2023 4:37 pm We were lucky in that our old house was so small (86 square metres) compared to the new house, they were able to take enough readings around the old backyard house before it was demolished - so we had geotech report done 9 months before we moved out. That said Perth is a different kettle of fish - our site costs were 10k! Hi Building Expert, Thank you for the feedback, much appreciated, there is also a code of conduct for building surveyors which they need to follow as well. I am looking… 4 4489 did you builder accepted that for final design ? our builder want to do final soil test after demolition as soil gets disturbed , pre build we got P with H1 but post… 8 5666 PM me your email. I have a build excavation calculator you can use based on your plans to double check what your builder is telling you. Cheers Simeon 1 11308 ![]() |