"For this lot, our engineer has fud that what you are wanting the front setback to be won’t work with the driveway grade As per the attached photos, the driveway falls 1m very steeply. To have the garage on setback 5.5m we wont achieve the allowable driveway grade. The house will need to be pushed back. Pushing the garage back alone wont be enough either as the portico sticks out too far at the front and you cant have a driveway higher than the portico."
Related
27/06/2023
4
Yeah mine about 9 metres long and 8 wide with slope of 25% at one point but the end point of the outlet is past the side of garage and if he concretes allowing for…
14/06/2023
3
If what you describe is correct then the brick wall has been dry lined with villa board. That basically means that the villa board is glued to the brick wall with…
2/04/2024
96
Hi All It has been a few weeks since my last update. The build has been progressing well. No major issues to report. The scaffolding was dropped today, gyprock will be…