- How flat should the pods be? Can they be this uneven? (see left in back ground, and right in foreground)
- the garage is set down but I believe by 70mm too much (error in plans). The frame will be steel and would be too short if the set down is too much. How can this be rectified?
- We have concrete piers. They haven't dug all the way down to the pier for the front steps - is there meant to be a thin dirt layer in between pier and slab or is it meant to be direct contact?
- Is it ok to have the gap under the boards like at the front?
Thanks so much!
Matt
Ashington Homes