Browse Forums Building A New House Re: At my wits end with McDonald Jones Homes… 2Feb 11, 2022 10:52 am Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: At my wits end with McDonald Jones Homes… 6Mar 10, 2022 4:55 pm Check it, but i understand If you have the standard HIA contract McDonald Jones Homes is required to formally advise you in writing of delays (with specific reasons) at the time of delay to be able to succesfully claim extensions of the contract build time. Minimum overhang into gutter must be 50mm, turn down tool should not split the sheet. it seems wrong tool for the profile was used, the flashing cannot slope back. Rib… 2 2468 Electrical just got back to me and said the most they can provide is a single power point on the Bedroom 1 side of that wall. After handover, your towel rail installer… 2 4910 |