Browse Forums Building A New House Re: Masterton Homes - The next thread 4.0 5061May 27, 2015 6:01 pm 5/14 $3900 paid 7/14 first drawn plans 8/14 Contracts 8/14 Plans to council 9/14 Q Central/Tiles 10/14 Colours/Electrical 31/10/14 Council Approval 11/14 Block cleared 12/14 Pre construction complete Re: Masterton Homes - The next thread 4.0 5063May 27, 2015 8:27 pm 2013 1st tender 24/10 Dep. 18/11 2014 5% 25/02 CDC approval 5/5 Demo 26/5 Pool 3/7 Valid'n 10/7 Slab 11/8 Frame 19/9 Bricks 23/10 2015 Roof 3/12 Lock up 11/2 PCI 31/3 Final insp. & keys 30/4 Re: Masterton Homes - The next thread 4.0 5065May 27, 2015 10:00 pm 2013 1st tender 24/10 Dep. 18/11 2014 5% 25/02 CDC approval 5/5 Demo 26/5 Pool 3/7 Valid'n 10/7 Slab 11/8 Frame 19/9 Bricks 23/10 2015 Roof 3/12 Lock up 11/2 PCI 31/3 Final insp. & keys 30/4 Masterton Homes - The next thread 4.0 5066May 27, 2015 10:03 pm 2013 1st tender 24/10 Dep. 18/11 2014 5% 25/02 CDC approval 5/5 Demo 26/5 Pool 3/7 Valid'n 10/7 Slab 11/8 Frame 19/9 Bricks 23/10 2015 Roof 3/12 Lock up 11/2 PCI 31/3 Final insp. & keys 30/4 Re: Masterton Homes - The next thread 4.0 5075May 28, 2015 8:11 am Ggml, we had the same issue. They plonked a garden tap on the front of our house, under the lounge window (ugly). I kicked up a massive stink, and even though they said it had to go there....in the end they moved to a more appropriate location. Re: Masterton Homes - The next thread 4.0 5076May 28, 2015 8:26 am MarkP, we used Ark for our plantation shutters (all windows except rear family room) and blinds on back room. We are very happy with the work they did. Had a couple of issues, which they fixed immediately, with no fuss. Re: Masterton Homes - The next thread 4.0 5077May 28, 2015 8:39 am We have used Ark too, yet to see the finished product, but were great about measuring - I met their person on site and he spent an hour brainstorming with me and going over options for how to fit blinds over retractable flyscreens, and took double measurements (Face and reveal) in case I change my mind. Re: Masterton Homes - The next thread 4.0 5078May 28, 2015 9:12 am redwynne Brettbert - All upgrades possible or electrical? I it was for a lot of things. I'm up to electrical but I have friends who are just starting and that's why I'm after the list. Do you have an electrical one? Building Symphony Grande Custom Masterton House and Land 12/6/14 Paid $3500 20/11/14 contracts signed deposit paid Re: Masterton Homes - The next thread 4.0 5080May 28, 2015 9:21 am Well that's not too bad Mgardz! I was looking at the $1000 price tags hehe! Yes Redwynne most definitely closer to 2600! Exactly, 100% agree re coughing up the refund! I'm hoping August at the latest! 100 day countdown takes me just into September so I think we should most definitely be in by then! Once the gyprock is done I will meet with our SS and see if he has a better estimate this time! Concerto Elite 4 17270 i imagine you also have another contract with an architect? and yeah, whatever other's said about special conditions and appendices 16 16751 Hi all I am looking to run a water line under my concrete footpath which is directly next to my home, was seeing if this is possible without cutting the entire section… 0 20780 |