Browse Forums Bathrooms and Laundry 1 Aug 26, 2023 2:29 pm the step up is 30mm and wanting it to be flat . how much does the concrete have to be lowered .we plan on removing bath and lenghten shower and adding seat. the old bath drain ( not sure if to tile over )and central drain- poss make to longer grate . Does the tiler do the removal of concrete? or can we Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ start from at least $20,000 just for fixtures and finishes and then add on for moving plumbing and extra for a concrete floored house last new bathroom we installed in a… 1 29930 if the original house is in good condition most of what you listed could be added in stages without the need for KDR and costs and disruption of having to live elsewhere… 1 24313 Can anyone help me out with this? I'm looking to renovate my house and came across these two designers on Fiverr ( if anyone knows this platform ) these… 0 2595 |