Browse Forums General Discussion 1 Nov 05, 2023 9:36 am Hi everyone I’ve recently had two new windows installed both are 2400 long. The height of the new windows means they sit 150mm below the height of the eaves. We are looking at getting our house rendered shortly and are wanting to infill these gaps. My question is that if this gap is filled in with a hebel/ foam product will they be able to render between the brick work and the infill or will it require an expansion joint between the two substrates, or is it even possible to render over the two different substrates without cracking issues?? Thanks DIY, Home Maintenance & Repair That has to be one of the most long winded non-answers I've ever seen. It looks like you fed the OP's question into AI and let it spit out the most generic answer ever.… 3 5622 In need of help. Could someone please help with the rendering colour and what it might be. 0 3915 Hi, have purchased a house with 2 single garage doors. The Centre pillar one side sits proud to the other. Can I change 2 doors into one. Please see picture. 0 15119 |