Browse Forums General Discussion 1 Nov 05, 2023 9:36 am Hi everyone I’ve recently had two new windows installed both are 2400 long. The height of the new windows means they sit 150mm below the height of the eaves. We are looking at getting our house rendered shortly and are wanting to infill these gaps. My question is that if this gap is filled in with a hebel/ foam product will they be able to render between the brick work and the infill or will it require an expansion joint between the two substrates, or is it even possible to render over the two different substrates without cracking issues?? Thanks Hi, have purchased a house with 2 single garage doors. The Centre pillar one side sits proud to the other. Can I change 2 doors into one. Please see picture. 0 7381 Hi All, This is our second home build and first time with a custom builder. They are small builder and have built some houses with good quality. They tender and color… 0 1598 I might be misunderstanding.... but I would be more inclined to cut a section out from the cinder block wall and place the cistern in the cinder block wall. Very messy job… 1 1934 |