I've filled, levelled and compacted around 100mm of roadbase in preparation to lay some outdoor court tiles. Prior to doing the final compaction, I dusted the top with cement and gave it a little bit of water. During compaction though, things got a little sticky and whilst the finished surface is flat, it's been torn up a little in a few places.
https://ibb.co/GJtdVCn
Would filling these with crusher dust followed by hand tamping be a suitable fix?