sylve
Thanks for the update
Insist on having the mortar joints raked and repointed
Brick mortar defect
Page 2 of 5
If your mortar has failed then brickwork needs to be demolished and rebuilt.
Really ?
So why have The stated on lab report to fix options ?
Should I question them about it ?
This is it
Sylve
I am not sure if you have read this
Brick Masonry Construction
also if your build is coastal durability will be a major issue
I am not sure if you have read this
Brick Masonry Construction
also if your build is coastal durability will be a major issue
your engineer will need to build up a case for repointing based on strength & long term durability (as per AS3700)
In Extreme cases some portions of the wall may need to be replaced, strengthen,etc,etc
Sylve Just curios, was masonry covered in your engineering details & notes?...the builders notes are generally useless
Please leave a PM
The builder will try to select the cheapest option since the repair cost is coming out of his pocket/Profit
your engineer will need to build up a case for repointing based on strength & long term durability (as per AS3700)
In Extreme cases some portions of the wall may need to be replaced, strengthen,etc,etc
Sylve Just curios, was masonry covered in your engineering details & notes?...the builders notes are generally useless
Please leave a PM
your engineer will need to build up a case for repointing based on strength & long term durability (as per AS3700)
In Extreme cases some portions of the wall may need to be replaced, strengthen,etc,etc
Sylve Just curios, was masonry covered in your engineering details & notes?...the builders notes are generally useless
Please leave a PM
Thanks that explains the cracking of brick panels between the articulation joints? .. please put some photos up of the location as panels may need to be fully replaced
Ok will do
I'll take pictures of all the bricks that are cracked
Builder is now wanting me to do a PCI walk through and said they want us to meet onsite with construction manager and supervisor and a new brick layer and show them what we want fixed ....
I'm concerned as they want me to sign some paper
Sylve Don't sign anything until a Structural Engineer Inspects the brickwork
Contact Engineers Australia Victoria ..pick a local engineer and have a chat to them
Please keep us informed.HTH
Contact Engineers Australia Victoria ..pick a local engineer and have a chat to them
Please keep us informed.HTH
@Sylve Don't sign anything until a Structural Engineer Inspects the brickwork
Contact Engineers Australia Victoria ..pick a local engineer and have a chat to them
Please keep us informed.HTH
Contact Engineers Australia Victoria ..pick a local engineer and have a chat to them
Please keep us informed.HTH
Thank you so so much on to them right now
Builder has sent an email
We are eager to sort this brickwork issue out with you and request a meeting on site to discuss the area in question so we can have these reviewed and rectified accordingly.
Can we say to the builder that we want it demolished and rebuilt ?,
Even though on the report they have gaven 3 options ?
"sylve
Thanks for the update
Insist on having the mortar joints raked and repointed"
How is repointing going to overcome structural weakness in the body of the mortar?
For that
We will be having a meeting on site this week
See what happens ....
Question
Can we say to the builder that we want it demolished and rebuilt ?,
Even though on the report they have gaven 3 options ?
Can we say to the builder that we want it demolished and rebuilt ?,
Even though on the report they have gaven 3 options ?
Not from what I've seen in your photos..although you will need to look at the wall loading to say otherwise
How is repointing going to overcome structural weakness in the body of the mortar?
You will need to provide evidence, calculations & proofs of tensile and bending Stresses, Failure, etc
The hand calculations are very complicated/difficult ..enter FEA/multiphysics software (Time based simulations) and there are now provisions for such in structural codes.
Here's what the battlers & Punters need to do
1. Get copies of all engineering specs,data,etc. Have the engineering independently inspected
2. Take photos of non compliance and future anticipated problem areas before they occur
3. Advise the builder of consequences of his failure to act, non-compliance and anticipated remedies
4.The evidence matches the simulations over time
5. It then becomes a Waiting game... There are lawyers & Engineers that specialise in such cases
I prefer the repairs and less confrontation methods...... before the messy court cases
Related
15/01/2024
7
Its the flashing and is normal. Some builders cover them up others just leave them handing. You can cover it up with an aluminium bracket or ask the builder.
11/07/2023
1
you need to understand the breakdown of warranties. 90 warranty is considered as minor defects rectification period where as the longer ones are more major/structural…
31/01/2024
1
Building Standards; Getting It Right!
There doesn't look to be any rebate in the slab to prevent water from scooting under the window. AS4654 is the Australian standard to look at/refer to. They have…