- Topics
- Provisional sum of $3,000 for double handling. Proovable?
- Does a data point require a metallic backing wall plate?
- What is this kitchen flooring? (pics included)
- Imposing a Legally binding contract with a Data Cabler
- Is this acceptable? Installed window particle board packer
- Employer has ACMA Open Registration licence but not staff
- Building Surveyor proof of approval at each stage?
- Rain water tank pre-plumbing prep for handover
- Should I get a Dilapidation Report done to avoid being sued?
- 2011-2012 Victorian FHOG & Boost to remain same as 2010-211