Browse Forums Building A New House Re: Burbank Custom Double Storey ~ Wrap and Bricks started!! 86Feb 26, 2014 9:15 pm Colours - 12/12/13 Contracts - 4/2/14 Slab - 12/3/14 Frame - 26/3/14 Lockup - 21/5/14 My Thread viewtopic.php?f=31&t=70419 Re: Burbank Custom Double Storey ~ Wrap and Bricks started!! 87Feb 26, 2014 9:19 pm Colours - 12/12/13 Contracts - 4/2/14 Slab - 12/3/14 Frame - 26/3/14 Lockup - 21/5/14 My Thread viewtopic.php?f=31&t=70419 Re: Burbank Custom Double Storey ~ Wrap and Bricks started!! 88Feb 26, 2014 9:28 pm Colours - 12/12/13 Contracts - 4/2/14 Slab - 12/3/14 Frame - 26/3/14 Lockup - 21/5/14 My Thread viewtopic.php?f=31&t=70419 Re: Burbank Custom Double Storey ~ Wrap and Bricks started!! 92Mar 02, 2014 3:30 pm Burbank Custom DS 23/01 Slab 14/02 Frame 15/04 Lockup 13/06 Fixing 02/09 PCI 11/09 Settlement My Build:viewtopic.php?f=31&t=68855 Blog:http://ourmentone3850.blogspot.com.au Re: Burbank Custom Double Storey ~ Wrap and Bricks started!! 94Mar 03, 2014 12:41 pm Colours - 12/12/13 Contracts - 4/2/14 Slab - 12/3/14 Frame - 26/3/14 Lockup - 21/5/14 My Thread viewtopic.php?f=31&t=70419 Re: Burbank Custom Double Storey ~ Wrap and Bricks started!! 95Mar 03, 2014 12:44 pm Colours - 12/12/13 Contracts - 4/2/14 Slab - 12/3/14 Frame - 26/3/14 Lockup - 21/5/14 My Thread viewtopic.php?f=31&t=70419 Re: Burbank Custom Double Storey ~ Ground Bricks continues!! 96Mar 03, 2014 12:46 pm Colours - 12/12/13 Contracts - 4/2/14 Slab - 12/3/14 Frame - 26/3/14 Lockup - 21/5/14 My Thread viewtopic.php?f=31&t=70419 Re: Burbank Custom Double Storey ~ Ground Bricks continues!! 98Mar 03, 2014 2:32 pm Okay Guys! SS called about lunch time saying now house is locked up and next stage is plaster. Then i contacted my Inspector to arrange time, guess what! My Inspector says they are already doing plaster! Which means my Inspector does not have a chance to do the pre plaster inspection, now have to jump to the pre handover one. So if your guys want to have pre plaster inspection later, u better watch your builders closely! They are moving very fast! I'm happy with the speed, meanwhile still disappointed with not being able to inspect the house now it is being covered up I didn't see any big issues, except a roof tile cracked, it will leak for sure, have to tell client relation girl about this... Re: Burbank Custom Double Storey ~ Ground Bricks continues!! 99Mar 03, 2014 2:37 pm trambay Okay Guys! SS called about lunch time saying now house is locked up and next stage is plaster. Then i contacted my Inspector to arrange time, guess what! My Inspector says they are already doing plaster! Which means my Inspector does not have a chance to do the pre plaster inspection, now have to jump to the pre handover one. So if your guys want to have pre plaster inspection later, u better watch your builders closely! They are moving very fast! I'm happy with the speed, meanwhile still disappointed with not being able to inspect the house now it is being covered up I didn't see any big issues, except a roof tile cracked, it will leak for sure, have to tell client relation girl about this... Seems to be full steam ahead for you .. Where as the brickies only resumed today ( apparently one injured their back late last week which explains why no work was done Thu / fri ) My inspector told us if they get frame right you don't really need a lock up stage inspection .. Crack Tile ? Did you climb up there or something ?? Re: Burbank Custom Double Storey ~ Ground Bricks continues!! 100Mar 03, 2014 2:49 pm Hi Mentone, I didn't do frame inspection that's why I'm disappointed no pre plaster inspection happening, but not unhappy, kind of just want an Inspector verify my thinking. Actually u can see the roof tiles standing inside of the house, one day i found tile cracks on slab, when i looked up, I saw the crack above ensuite toilet, light can leak in so will rain... then I walk around quite few times only found this one crack, will ask them to replace it! Our external decking was only installed 2 months ago, and already moulded, with cracks, and some timber decolorated. The decking is in an exposed area, uncovered in our… 0 1415 Hi All, Recently we have signed a contract with Burbank and we are not aware that they have just DORSET, SURREY, HAMPSHIRE, KENT, PILBARA and REDGUM bricks from PGH are… 0 3807 If there have been changes, variations, during construction then the drawings should be revised, the building permit amended and the current, as built drawings given to… 2 4828 |