Forum Building A New House Re: No occupancy permit unless appliances are sourced throug 2Jan 09, 2018 11:24 am Check your state regulations but below is a link to a post on occupancy permits http://anewhouse.com.au/2012/01/occupancy-permit-what-does-it-mean/ The Harder You Try - the Luckier You Get ! Web site http://www.anewhouse.com.au Informative, Amusing, and Opinionated Blog - Over 600 posts on all aspects of building a new house. Re: No occupancy permit unless appliances are sourced throug 3Jan 09, 2018 11:51 am bvillemot if your connections are standard 240v Plugs and sockets you can fit & plug them into the sockets yourself after handover Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs https://plus.google.com/u/3/communities ... 1476023758 Re: No occupancy permit unless appliances are sourced throug 4Jan 09, 2018 2:18 pm Not true. I'm building in Vic and am supplying my own cooktop, oven and dishwasher after handover. Builder's plumber and sparky is only providing the provision for these items (e.g. power point, water point etc.) and is giving me a credit for the appliances which come standard with the house. Potentially, the builder is saying to you that they will only install equipment supplied by their suppliers (vs. Harvey Norman) for their own warranty purposes. The builder's prices will be higher due to the builders margin which is added on top of the RRP for the items. Re: No occupancy permit unless appliances are sourced throug 5Jan 11, 2018 6:46 pm ![]() Builder has given me a quote for appliances and I can get them cheaper at Harvey Norman. When I mentioned this and asked whether I can install after handover or supply and they install only, they mentioned they need to use both their suppliers and installers otherwise I won’t be able to get an occupancy permit. I don’t think this is right but can’t find anything to send to them to back myself up. Anyone have a link I can send to them or what is the process? see more at hoffmangoldwithporterdavis.wordpress.com Re: No occupancy permit unless appliances are sourced throug 6Jan 12, 2018 10:19 am At what stage is your build? Have appliances been included in your contract price? Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Hi. I'm just after some advise. Our build has gone over our contract time and the two extensions of time the builder has given us. We had our independent inspector go… 0 363 Power is required so it would be expected that power and lighting would work in most of the house. The idea of an occupancy certificate is you can move in if you are… 3 519 ![]() When you receive your occupancy certificate, should you receive all the other documentation with it like the waterproofing, termite barrier, double glazing, insulation… 0 363 |