Browse Forums Building A New House Re: Hickinbotham Build Northern Adelaide 445Nov 10, 2017 1:54 pm Entilzha looking at my pics last night i realised i didnt specify door opening direction so they both open left to right - no problems as not a real concern to me as i will only be using one most of the time anyway - Also realised i will need my stepladder to lock/unlock them but happy to have had the patio bolts included in the door as looks real solid. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ after you mentioned about the directions of opening we looked at ours, and the one at the dining area opens right to left and the one opening to the alfresco is left to right (ours is only 210 high and 240 wide) cause we have standard hight ceilings Re: Hickinbotham Build Northern Adelaide 446Nov 10, 2017 2:09 pm I didn't even pick up on the little arrows on the plans that indicate which direct the doors slide till today its the little things that you notice afterwards - just glad i dont care about this one Re: Hickinbotham Build Northern Adelaide 447Nov 10, 2017 2:11 pm Entilzha I didn't even pick up on the little arrows on the plans that indicate which direct the doors slide till today its the little things that you notice afterwards - just glad i dont care about this one true I did not even know either, well so we learn, doors is something I can live with lol. Re: Hickinbotham Build Northern Adelaide 448Nov 10, 2017 2:14 pm Entilzha standard doors. each is 2.4 x 2.4 so pretty big ones. with a 35cm wall in between them They look great! We are having the dowell black ones too but the are called 'Alfresco Stackers' - 2400h x 3600w. All the best with build! Re: Hickinbotham Build Northern Adelaide 451Nov 12, 2017 6:29 pm Yes but my question is it looks like so far they have only provided a purple tap to the front. I would assume tap point provided for trades to wash gear with and testing. Rear has both tap points. But no gas pipes done yet. Will check it again on wednesday when i go up there Re: Hickinbotham Build Northern Adelaide 452Nov 12, 2017 7:09 pm Entilzha Yes but my question is it looks like so far they have only provided a purple tap to the front. I would assume tap point provided for trades to wash gear with and testing. Rear has both tap points. But no gas pipes done yet. Will check it again on wednesday when i go up there Yes! For tradies, ours got done in bits too woohoo Re: Hickinbotham Build Northern Adelaide 453Nov 14, 2017 12:13 pm Someone just drove past my block and advised no roofing today but it is quite windy there currently but gutters etc are done so its now all ready for the roof when the weather is compliant Re: Hickinbotham Build Northern Adelaide 457Nov 14, 2017 12:42 pm Surfmist - as is my gutters, fascia, downpipes front door and garage door - hoping its not to much but went for a 2 tone colour scheme for outside Picked the lighter colours for better heat reflection Re: Hickinbotham Build Northern Adelaide 460Nov 16, 2017 6:34 pm Havent been up to check anything since someone went pass on tuesday so no idea if roofing done yet but sounds like my linings arè still booked for the 29th (tentaviley) which was good to hear. Also been advised no problems to put a cable management conduit where my wall mount tv will be. And same for putting a eave vent kit above wall where my cooktop will be. Will be easier than trying to get it into position afterwards i hope. Hi, I'll be starting on my verandah repair soon - replace ledger, rafters, roofing iron, flashing etc. (fascia board already done). My question is about the timber ledger… 0 930 1 1343 Hi All, see above image. The required setback from the rear boundary in my case is 5m, as you can see the shape of the site and location of the boundary is slightly… 0 5835 |