1) Black steel poles are getting put up along the reservation of the rail line to install black wire fence.
2) Still one soil moving truck moving the soil but the job is getting done,
3) Footpaths surrounding the small Island facing Eades street is left to do, along with half of the middle Island,( The Alberico way Half)
4 F Hogan were also there doing things.
All this was by 11.20. Black big clouds were all over but I knew they were moving North. If rains stay away I cannot see why they would need another month..
Two days left and if no rain the footpaths should be finished and the fence along the rail line, If they don't want to be a Mickey Mouse organization pretending to be Civil constructors they will aim for the 30th, and if they need another week then good.
hi
any updating for stage2 on south siding?
ps:I am the first floor,hahah