Ashgrove33
Ilan
How did it go for you to do floors outside of PD? Were there problems lining up your floorboards with height of PD carpet and tiling. We're thinking about outsourcing but worried there will be teething problems getting external work lining up post habdover
Hey we are doing tiles after handover and through kitchen culture appointment they made note that we were doing tiles afterwords and to leave the required 20mm. My dad owns a tile shop and told me all the right things to say and look for! If you need tiles his shop is in east Keilor - The Tile Shed