My ss usually does the fixing after he gets the report from our inspector. They should do it right away. That way there’s less after hand over.
viewtopic.php?t=86597
There are items on the list that we have addressed 2 and a half months ago and longer. Massive issues that will take time to fix and should have been addressed way earlier than now. Very spiteful behaviour unfortunately.
We did have a private inspector and he was speechless as to how poor the workmanship was.
Your private inspector usually writes a report gives it too you then you give it too your ss. Then if Metricon don’t agree with it. They would go back to your ss and your ss will come back too your inspector. Then you go to your inspector and he goes to bat for you with Metricon.
.
Our first report from hebel and framed and quiet a few faults. But then our inspector came back. Checked everything over. And was very impressed. Pretty much all was done. And only found 6 minor faults that was done after.
Our inspector has been there quiet a few times. His come at Pre slab, slab, frame, then frame and when hebel was up. Now his coming for the lock up stage. His very particular and that’s why he comes to see many stages and at different times cos he really checks that they have done things.
His also an ex builder which are usually the best too have. As they have so much experience. He was also taught by a guy that all the builders know and despise. And is very well known.
Did Metricon come back at all to your inspector?