Browse Forums Building A New House Re: Mojo Homes 197May 15, 2016 2:35 pm Hello there, We are looking at Nova 38 and have just finished our colour appointment, and were given a date a few weeks later for building contract signing. For those that are doing knockdown rebuild, whats the time you allow for moving and demolition after that date? thanks Re: Mojo Homes 198May 15, 2016 6:46 pm Hi All Thanks for sharing your build Rollercoaster. Your home looks great. Cant wait to see more. Hope yours is coming along Jay30. We had a phone call from our supervisor Nick last friday to keep us updated. He said the scaffolding was due to arrive on tuesday and true to his word there it was. It looks like a construction in itself. Our plumbing looks to be done and the electrician was working there on Saturday so hope for the top floor hebel to get done now and roofing etc. Hope to post more photos later this week Re: Mojo Homes 199May 15, 2016 8:34 pm Hi All Hi Ahoythere - we had our colours appointment in early August last year and had knocked our old place down at the end of October. Mojo started on site at the end of November. Looks like your place is steaming ahead Miss Shanty - hope it keeps cracking on quickly. FYI - If anyone is interested there is a Facebook group for people building with Mojo - strangely enough its called Building with Mojo! Re: Mojo Homes 200May 15, 2016 8:39 pm Rollercoaster Hi All, Haven't been on here in ages (originally posted as Brad and Penny1 back on about page 2) but though I'd share our experience so far.... We are building the Melody 39 in Kirrawee NSW after having knocked down our old place in October 2015. Building started in December 2015, and Mojo were able to get the slab down and the first floor frame up before Xmas. The Christmas break was long, and in spite of receiving an email from Mojo on 11 Jan saying that all staff were back at work we didn't see any further action on our site until Feb when the second storey from went up and the Hebel was delivered. I think from memory the heel sat in the front yard for about two weeks before an installation team from Melbourne arrived to complete the ground cladding around the end of Feb. Waited another couple of weeks before another crew arrived in mid-March to start work on the second floor Hebel. The rendering and painting of the second floor has now been completed, I think they still have some things to fix with the Hebel ( I could be wrong but I remember the S/S saying something about that a couple of weeks ago when we last met on site). Electrical and plumbing rough ins, insulation, air con ducting and cables, TV co-ax etc have now been completed and the gyprock is going up on the internal walls (ground floor completed today I think). Anyway that's where we're at - its been a long and at times frustrating journey thus far. Our S/S has been helpful and responsive, although I think he gets as frustrated as we do at the unreliable nature of the trades he has to deal with. CSR have been particularly painful in getting people on site. Given the speed at which the Hebel goes up it just kills you to see it sitting there in your yard for a month knowing that it is holding everything else up. In spite of the frustrations we are closer the the end than the beginning, and the building is of a high quality. I'll post some photos if I can figure out how.... http://imageshack.com/a/img921/2520/3NQi1L.jpg http://imageshack.com/a/img922/2222/FGLKks.jpg http://imageshack.com/a/img922/4605/gjA5ri.jpg http://imageshack.com/a/img921/711/1JtxRo.jpg http://imageshack.com/a/img923/386/eWvvHH.jpg http://imageshack.com/a/img924/5994/kGp4OX.jpg Hi Rollercoaster, Thanks for sharing the pics. Just wondering, is your facade a variation of Grande? Cheers, Vithal Is anyone building with Mojo and have a recent site cost tender 0 15930 Hi all, We are considering Enigma 46 from Mojo Homes in Gables, NSW. Has anyone built with Mojo and any pointers and feedback. Also, if anyone has built similar design… 0 13131 Hi, We are looking for a builder that can build a small home (smaller length) on a sloping site. We came across Mojo's Zephyr design 10.6 m wide and 11.5 m length. Does… 0 22925 |