Browse Forums Building A New House Re: Sahara Q1 build - Roofing started 626Nov 26, 2014 9:29 pm sassid ...building the Emporio with MainVue/Henley BLOG: http://thewaldorfproject.blogspot.com.au/ HOMEONE THREAD : https://forum.homeone.com.au/viewtopic.php?f=31&t=75753 Re: Sahara Q1 build - Roofing started 628Nov 26, 2014 9:48 pm ------------------------------------------- Build Thread - Mainvue Emporio ER430 KDR https://forum.homeone.com.au/viewtopic.php?f=31&t=76790&p=1332227&hilit=mainvue#p1332227 Re: Sahara Q1 build - Roofing started 639Nov 27, 2014 9:06 pm MyH1Login Nice gate! Do u have a fence on the other side? We got a quote for $48/m if you still need it, timber paling 1.8m but not sure if there's a sleeper part. Thanks, problem is our estate requirements. We have to get colorbond fence in a specific color. Main reason we prefer 2m height as our current house has 1.8m and we can see neighbor in their living area from our kitchen. Re: Sahara Q1 build - Roofing started 640Nov 27, 2014 9:08 pm macmaz Well in that case by default that's a preferred option. Definitely will look great. Thanks macmaz, hopefully it would be nice. It was my decision to go with wooden so I'll be in line of fire when oiling time will come We were lucky in that our old house was so small (86 square metres) compared to the new house, they were able to take enough readings around the old backyard house before… 8 37140 The concreter will take and reuse. In my case I bought structural LVLs and scraped them back and used them as joists. 1 5152 you need to understand the breakdown of warranties. 90 warranty is considered as minor defects rectification period where as the longer ones are more major/structural… 1 5339 |