Browse Forums Building A New House Re: Building with Kurmond Homes 1609Sep 06, 2017 11:56 am hi there? is anyone currently in process with Kurmond? We have done our external colour selection and and will have tiles selection shortly. Can anyone give any feedback about about Kurmond Dimond upgrade tiles and laminate selection? we are think if we should go with Kurmond or do our own flooring. any ideas? Re: Building with Kurmond Homes 1610Sep 08, 2017 5:27 pm we requested a quote for upgrade of external wall insulation from R2.0 to R2.5. It was a surprise to receive a quote of around 3600 dollars! our small house can be insulated with R2.5 batts TWICE for this price.. and we would still have R2.0 batts left ... that's just a note for those who haven't started their paperwork. put EVERYTHING in the initial tender (before paying any money to the builder) and decide if you can live which their prices. otherwise they will just inflate the quotes and make you pay. Re: Building with Kurmond Homes 1611Sep 11, 2017 1:47 pm nada17, we asked about upgrading our wall insulation and were informed R2.0 was the highest R-value supplied by Bradford for wall insulation. Bradford's website appears to support this. Your quote appears inconsistent with the information we were given. Re: Building with Kurmond Homes 1614Sep 22, 2017 4:59 pm Thought Id post - as we built with Kurmond - custom duplex - have moved in for about 10 months. We had a nightmare with the build but the finish was slightly better than the average but thats because we got the Diamond package and we also upgraded a lot of the small things (LED down lights; 40mm waterfall kitchen bench; changed hinged doors to sliding cavaties - basically a lot of the 'additionals' added up! Nothing is for free, that I know!) We basically picked two homes that we liked from their range and chopped it up slightly to suit our families - parents reside on the other side. That said, our side is larger than next doow - ours caters for a family of 5 and next door is just two Seniors. The build stretched out for about 2-2.5 years, this includes waiting for council approval for 6 months. Delays were due to: - builder short staffed - we went through about 4 or 5 site supervisors - builder didnt know that we required detention pits which costed us additional $70K - very pricey not to mention the delay, back and forth between Engineer and Council - council feedback, our duplex is only joined by the garage, so at the back of the house, there is an alley between the two, so there are windows on both sides of house to give it more natural lighting - everytime we were due to hit a milestone (foundation; frame; brick work; etc) we hit public holidays (Christmas or Easter) so a lot of time wasted. We also went through two Christmas' which meant 6-8 weeks of no one working on the house - they also got some of the build wrong and refused to fix it (waterproofed the wrong side of the retainer wall, which resulted our neighbour taking us to court due to excess water into their property when heavy rain hit) - we ended up paying a labourer to dig up and got Kurmond out to quickly waterproof the correct side but this was at our cost There are pros and cons with every builder, Kurmond is not bad but they are a young and inexperienced Company if comparing to the bigger players. I personally think we had bad luck with our build as we hit one problem after another, costing us way too much money. After moving in, we discovered a light fitting not put in at all; the frame for detention pits on driveway still in (we are not able to get our OC due to this), so we had to arrange someone to come and go under the driveway into the pits and remove the wooden frame, one of the frames for the back sliding door was not installed; lots of unsatisfactory paint issues; cracked tiles; little bits and pieces which Ive not forgotten. But we did pay for an independent consultant to come and inspect the house at handover time to make notes on what Kurmond hasnt completed/done against the contract. Would I use them again? if they pulled their socks up with their internal processes - potentially and if their pricing is good as we paid $720K for the duplex and it was custom and essentially it is two residences. Re: Building with Kurmond Homes 1615Sep 22, 2017 6:43 pm Thanks Melon168 for your thorough feedback! We're in tendering process at the moment and we've only paid the $1000 deposit and nothing else so far... I'm still considering our options at the moment but I am conscious of issues with every builder but it's just good to know what to look out for etc.. Thanks again for your feedback! I hope your issues get rectified! Thanks Melody Re: Building with Kurmond Homes 1616Oct 17, 2017 12:49 pm nada17 Hi guys! We are thinking of building with Kurmond. Would you recommend? Kurmond Home will take realistically 18-22 months to build the new double story home!!!! My suggestion to those people who wants to build home in less than that time then go and find the different builder. Kurmond Home has very cooperative staff but their working style is time-consuming compared to other builders. Well, they will always have excuses, arguments and/or explanation to prove themselves right !!!! Re: Building with Kurmond Homes 1617Oct 17, 2017 12:57 pm 1building nada17 Hi guys! We are thinking of building with Kurmond. Would you recommend? Kurmond Home will take realistically 18-22 months to build the new double story home!!!! My suggestion to those people who wants to build home in less than that time then go and find the different builder. Kurmond Home has very cooperative staff but their working style is time-consuming compared to other builders. Well, they will always have excuses, arguments and/or explanation to prove themselves right !!!! Spot on! They have all the excuses and we were always left speechless, then annoyed and then just frustrated. Re: Building with Kurmond Homes 1618Oct 17, 2017 12:57 pm nada17 hi there? is anyone currently in process with Kurmond? We have done our external colour selection and and will have tiles selection shortly. Can anyone give any feedback about about Kurmond Dimond upgrade tiles and laminate selection? we are think if we should go with Kurmond or do our own flooring. any ideas? We are building with Kurmond Home! We have paid for Dimond Elite package but still we have paid extra to upgrade a tile as their tile supplier e.g. Manago Tile has a huge range of tile option but modern looking gloss finish tile which we are after, that wasn't included in Dimond Elite Package. Re: Building with Kurmond Homes 1619Oct 17, 2017 1:02 pm melon168 1building nada17 Hi guys! We are thinking of building with Kurmond. Would you recommend? Kurmond Home will take realistically 18-22 months to build the new double story home!!!! My suggestion to those people who wants to build home in less than that time then go and find the different builder. Kurmond Home has very cooperative staff but their working style is time-consuming compared to other builders. Well, they will always have excuses, arguments and/or explanation to prove themselves right !!!! Spot on! They have all the excuses and we were always left speechless, then annoyed and then just frustrated. Yes, it is frustrating!!! I argue a lot with them but ... at the end, they wouldn't let us win!!! Are you building with them? Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 74701 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 105534 Hi there! Putting the feelers out there for those who have (or almost) built with Arli homes! Interested in your experiences who've built from their stock home designs… 0 23481 |